Business

Eastport Critical Metals Corp. Announces New Uranium Discovery at Foley Uranium Project, Botswana

First Batch of Assay Results Demonstrate Consistent Flat Lying Uranium Mineralization over 1.4 km Strike LengthVancouver, British Columbia--(Newsfile Corp. - May 28, 2026) - Eastport Critical Metals Corp. (TSXV: EVI) (OTCQB: EVIIF) ("Eastport" or the "Company") is pleased to announce the first batch of laboratory assay results for the Phase 1 reverse circulation (RC) drilling program at the Foley Uranium Project in Botswana.Assays from the first 10 RC holes of the program have been received. The

articleEastport Critical Metals Corp.May 28, 20266/company/eastport-critical-metals-corp/news/eastport-critical-metals-corp-announces-new-uranium-discovery-at-foley-uranium-project-botswana
Eastport Critical Metals Corp. Announces New Uranium Discovery at Foley Uranium Project, Botswana

About this update from Eastport Critical Metals Corp.

[{"type":"text","content":"First Batch of Assay Results Demonstrate Consistent Flat Lying Uranium Mineralization over 1.4 km Strike Length","length":111,"tagName":"p","attribs":{"class":"nfSubHeading"},"className":""},{"type":"text","content":"Vancouver, British Columbia--(Newsfile Corp. - May 28, 2026) - Eastport Critical Metals Corp. (TSXV: EVI) (OTCQB: EVIIF) ("Eastport" or the "Company") is pleased to announce the first batch of laboratory assay results for the Phase 1 reverse circulation (RC) drilling program at the Foley Uranium Project in Botswana.","length":342,"tagName":"p"},{"type":"text","content":"Assays from the first 10 RC holes of the program have been received. The results, obtained using the pressed pellet analytical technique, demonstrate potential for large-scale uranium mineralisation (>200ppm U3O8), with uranium intersected in 6 holes over a 1.4 km strike length. Assay results are pending for an additional 5 holes [Total RC Drill Holes: 24].","length":362,"tagName":"p"},{"type":"text","content":"Highlights:","length":11,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"RC006: 8.0 m @ 553.0 ppm U₃O₈ from 84.0 m, including 2.0 m @ 1,272 ppm U₃O₈ from 87.0 m.","length":88,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"RC003: 6.0 m @ 500.7 ppm U₃O₈ from 92.0 m, including 3.0 m @ 806 ppm U₃O₈ from 92.0 m.","length":86,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"RC005: 1.0 m @ 2,333 ppm U₃O₈ from 103.0 m.","length":43,"tagName":"p","attribs":{}}]}],"tagName":"ul","bulletedList":true,"length":217,"olType":false},{"type":"text","content":"The reported drill fence is located approximately ~350 metres north of the Letlhakane deposit (Figure 1), a project owned by Lotus Resources Limited. According to publicly available disclosure by Lotus Resources Limited, the Letlhakane project hosts a reported Mineral Resource Estimate consisting of Indicated Mineral Resources of 71.6Mt grading 360 ppm U₃O₈ for 56.8 Mlb contained U3O8, and Inferred Mineral Resources of 70.6Mt at 366 ppm U₃O₈ for 56.9 Mlb contained U3O8, based on a 200ppm U3O8 cut-off grade.1","length":513,"tagName":"p"},{"type":"text","content":"Furthermore, Lotus Resources concluded a Scoping Study for the Letlhakane Uranium deposit in 2025. The study outlined a 10-year open-pit mining operation producin...

More updates from Eastport Critical Metals Corp.

Eastport Critical Metals Corp.Foley Uranium ProjectLotus Resources LimitedLetlhakaneBotswanaMineral ResourceEastportEastport Critical Metals CorpNewsfile Corp.Assay Results