Business
Sampling of Petro-Lithium Brine from the First 43 Wells Complete, under Analysis
Sampling of Petro-Lithium Brine from the First 43 Wells Complete, under Analysis ...

About this update from E3 Lithium Ltd
[{"type":"text","content":"Sampling of Petro-Lithium Brine from the First 43 Wells Complete, under Analysis \n\t\t\tbody { font-size: 11pt;\n\t\t\t}\n\n\t\t\t.nr-sub-head ul,\n\t\t\t.nr-body ul {\n\t\t\t\tlist-style-type: disc !important;\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-sub-head ol,\n\t\t\t.nr-body ol {\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-body p, .nr-body {margin-bottom: 0px !important;\n\t\t\t\t\tmargin-top: 0px !important;\n\t\t\t\t\t-webkit-margin-before: 0px !important;\n\t\t\t\t\t-webkit-margin-after: 0px !important;\n\t\t\t\t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 11pt !important;\n\t\t\t }\n\n\t\t\ttbody {\n\t\t\t\tborder-top: 0;\n\t\t\t}\n\n\t\t\t H1 {font-weight: bold;\n\t\t\t\tfont-size: 16pt;\n\t\t\t }\n\n\t\t\t H2 {font-weight: bold;\n\t\t\t\tfont-size: 12pt;\n\t\t\t }\n\n\t\t\t H3 {font-weight: bold;\n\t\t\t\tfont-size: 11pt;\n\t\t\t }\n\n\n\t\t\t H1.nr-head {\n\t\t\t \t\tfont-family: Trebuchet MS !important;\n\t\t\t \t\tfont-size: 16pt !important;\n\t\t\t \t\tcolor: #3D86C6 !important;\n\t\t\t \t\tfont-weight:bold !important;\n\t\t\t \t\ttext-align:center !important;\n\n\t\t\t }\n\n\t\t\t H2.nr-sub-head {font-weight: bold !important;\n\t\t\t \t\tdisplay: block !important;\n\t\t\t \t\ttext-align: start !important;\n\t\t\t \t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 12pt !important;\n\t\t\t }\n\n\t\t\t .nr-body a { font-size: 11pt !important;\n\t\t\t }\n\n\t\t\t TABLE { width: auto!important;\n\t\t\t }\n\n\t\t Sampling of Petro-Lithium Brine from the First 43 Wells Complete, under Analysis\n Highlights\n\n\n\t\n\tThe first round of sampling from 43 petroleum wells in Alberta is complete\n\t\n\t\n\tE3 Metals expanded the number of wells sampled by over double originally planned as a result of the overwhelming support from oil and gas operators\n\t\n\n Vancouver, BC (FSCwire) - E3 METALS CORP. (TSX-V: ETMC, FSE: OU7A) (the “Company” or “E3 Metals”) is pleased to announce the completion of the first round of sampling of Petro-Lithium brine water from petroleum wells, located over several of E3 Metals’ Metallic and Industrial Minerals (MIM) Permits in Alberta. Samples have been collected in collaboration with 11 oil and gas operators. The samples have been received at the accredited laboratories and are undergoing analysis.\n\n \...