Business
E3 Lithium Announces Arrival of Equipment for the Demonstration Facility at the Clearwater Project Site
E3 LITHIUM LTD. (TSXV: ETL) (FSE: OW3) (OTCQX: EEMMF), “E3”, “E3 Lithium...

About this update from E3 Lithium Ltd
[{"type":"text","content":"E3 Lithium Announces Arrival of Equipment for the Demonstration Facility at the Clearwater Project Site\n\n\n .bwalignc { text-align: center; list-style-position: inside }\n.bwalignl { text-align: left }\n.bwblockalignl { margin-left: 0px; margin-right: auto }\n.bwcellpmargin { margin-bottom: 0px; margin-top: 0px }\n.bwpadl0 { padding-left: 0px }\n.bwtablemarginb { margin-bottom: 10px }\n.bwuline { text-decoration: underline }\n.bwvertalignt { vertical-align: top }\n.bwwidth1 { width: 1% }\n.bwwidth100 { width: 100% }\n.bwwidth2 { width: 2% }\n.bwwidth97 { width: 97% }\n \n\n\n\n E3 LITHIUM LTD. (TSXV: ETL) (FSE: OW3) (OTCQX: EEMMF), “E3”, “E3 Lithium” or the “Company,” a leader in Canadian lithium, is pleased to announce the on-schedule arrival of equipment for the Demonstration Facility at the Clearwater Project site, including the 30-column Direct Lithium Extraction (\"DLE\") system and associated polishing and purification units. This equipment will be used for both Phase 1 and Phase 2 of the planned testing at the Demonstration Facility.\n \n\n This press release features multimedia. View the full release here:\n \n https://www.businesswire.com/news/home/20250710649096/en/\n \n\n\n\n\n Demonstration Equipment Skids Arriving on Site, July 7, 2025\n \n\n\n The equipment consists of five separate skids that will be tied together to operate fully automated. Over the next few weeks, all equipment will be assembled on-site and tested to ensure that no damage occurred during transport. The commissioning of the equipment will begin with leak testing and electrical inspections, and then raw brine will begin to be processed. Phase 1 of the demonstration program concludes with the completion of the commissioning using brine available on the surface and the production of lithium carbonate.\n \n\n “The arrival of the equipment officially kicks off our Demonstration Program and is a key milestone towards commercial lithium production,” said Chris Doornbos, President and CEO of E3 Lithium. “With only a few systems of this kind operating, we appreciate each of our vendors and engineering firms for their ongoing support. The E3 Lithium team is excited to get the equipment operating and we look forward to providing additional updates on the Demonstration Facility as we progress t...