Business
DynaResource, Inc. Reports Gold Production From San Jose de Gracia
DynaResource, Inc. Reports Gold Production From San Jose de Gracia.

About this update from Dynaresource, Inc.
[{"type":"text","content":"\n \n \n DynaResource, Inc. Reports Gold Production From San Jose de Gracia\n \n \nDynaResource, Inc. Reports Gold Production From San Jose de Gracia\n \n IRVING, TX--(Marketwired - Jun 18, 2014) - DynaResource, Inc. (OTCQB: DYNR) (\"DynaUSA\", and \"the Company\") is pleased to announce that Mineras de DynaResource S.A. de C.V. (\"MinerasDyna\"), the 100% owned subsidiary of DynaUSA and the exclusive operator of the San Jose de Gracia Property in northern Sinaloa, México (\"SJG\"), is reporting the production and delivery for sale of approximately 511 Oz. gold contained in concentrates (exact weights in gold and silver oz. to be determined at final settlement). MinerasDyna is further reporting the final settlement of the prior sale of 239 Oz. gold at $1,311/Oz. (See DynaUSA news release dated May 9, 2014).\n The overall production of the estimated 750 Oz. gold was produced through May from approximately 2,500 tons of mineralized material processed through the gravity circuit of the Pilot Mill Facility at SJG. MinerasDyna further reports that approximately 2,450 tons of tailings, remaining after the gravity concentration, will be re-processed through the gravity circuit for additional metallurgical tests; and will be processed further through the flotation circuit of the SJG Pilot Mill Facility. MinerasDyna further reports that contract mining work during the rehabilitation of the San Pablo mine has provided approximately 3,250 tons of mineralized material, of which 800 tons remain in stockpile for mill processing. Internal assays report an average grade of 12.43 g/t Au for the 3,250 tons, including grades up to 38.3 g/t Au.\n MinerasDyna plans to continue its current operations at SJG, consisting of contract underground mining at San Pablo; and delivery of mined mineralized material to the SJG Pilot Mill facility for subsequent processing and metallurgical testing. The Pilot Mill facility consists of a basic gravity-flotation circuit which has been refurbished and improved from the Pilot Mill facility operated at SJG during the 2003-2006 Period. (See \"MinerasDyna; Mine Plan and Mill Operations\", below).\n Mr. K.D. Diepholz, Chairman-CEO of DynaUSA, and President of MinerasDyna said: \"I would like to express my thanks again to the operating managers of MinerasDyna, whose focused, committed work have guided Mine...