Business
DLP Resources Intersects 365.7m of 0.81% CuEq* Within a 970.7m Interval of 0.53% CuEq* on the Aurora Project in Southern Peru
Cranbrook, British Columbia--(Newsfile Corp. - October 11, 2023) - DLP Resources Inc. (TSXV...

About this update from Dlp Resources, Inc.
[{"type":"text","content":"DLP Resources Intersects 365.7m of 0.81% CuEq* Within a 970.7m Interval of 0.53% CuEq* on the Aurora Project in Southern PeruCranbrook, British Columbia--(Newsfile Corp. - October 11, 2023) - DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) (\"DLP\" or the \"Company\") announces receipt of complete drill results for drillhole, A23-011 on the Aurora porphyry copper-molybdenum project in southern Peru (Figure 1).Results for the first ten drillholes, A22-001, A22-002, A22-003, A23-004, A23-005, A23-006, A23-007, A23-008, A23-009 and A23-010 were released on September 05, 2023 (see DLP Resources Inc., news releases of September 05, 2023 for results for A23-001 to A23-010 and Table 3 below). HighlightsDrillhole A23-011 was drilled approximately 268m southwest of drillhole A23-010 and intersected significant copper and molybdenum mineralization throughout the hole to a depth of 1081.70m. A23-011 ended in molybdenum mineralization and the most significant mineralized intervals included:0.53% CuEq* over 970.70m (0.17% Cu, 0.0667% Mo and 1.81g/t Ag) from 111m to 1081.70m.0.54% CuEq* over 32.00m (0.44% Cu, 0.0125% Mo and 3.69g/t Ag) from 183.00m to 215.00m.0.66% CuEq* over 557.70m (0.09% Cu, 0.1078% Mo and 1.38g/t Ag) from 524.00m to 1081.70m.0.81% CuEq* over 365.70m (0.07% Cu, 0.1403% Mo and 0.66g/t Ag) from 716.00m to 1081.70m.The complete set of results for A23-011 are summarized in Table 1 below.Mr. Gendall, President and CEO commented: \"A23-011 was drilled on a step-out of 268m to the SW of A23-010 to define the western edge of the hornfels-porphyry contact on the southeast side of Aurora. This hole now confirms a copper-molybdenum mineralized trend of at least 980m which is still open to the southeast and west. This hole ended in molybdenum mineralization at a depth of 1081.70m. Drilling is ongoing on the southeast side and A23-012 is being drilled on a step out of approximately 140m west of A23-011 to a depth of 1000m. We continue to be encouraged with the results of the first 11 drillholes and look forward to receiving results for A23-012 in early November.\" Aurora Cu-Mo Project - Summary of Drill Results for A23-011Drillhole A23-011 (Figures 2, 3 and 4) commenced on August 16, 2023 and was completed on September 16, 2023 at a depth of 1081.70m. The drillhole was drilled on an azimuth of 025 degrees with a dip of -70 degr...