Business
DLP Resources intersects 221.4m of 0.95% CuEq* within a 693.4m interval of 0.64% CuEq* on the Aurora Project in Southern Peru
Cranbrook, British Columbia--(Newsfile Corp. - June 1, 2023) - DLP Resources Inc.  (TSXV: ...

About this update from Dlp Resources, Inc.
[{"type":"text","content":"DLP Resources intersects 221.4m of 0.95% CuEq* within a 693.4m interval of 0.64% CuEq* on the Aurora Project in Southern PeruCranbrook, British Columbia--(Newsfile Corp. - June 1, 2023) - DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) (\"DLP\" or the \"Company\") announces receipt of complete drill results for the fifth hole, A23-005 on the Aurora porphyry copper-molybdenum project in southern Peru (Figure 1).Results for the first four drillholes, A22-001, A22-002, A22-003 and A23-004 were released on December 05, 2022, January 05, 2023 and May 02, 2023 (see DLP Resources Inc. news releases).HighlightsDrillhole A23-005 intersected significant molybdenum-copper mineralization throughout the hole to a depth of 693.4m where it ended in very good molybdenum mineralization. The most significant mineralized intervals included:0.64% CuEq* over 693.40m (0.11% Cu, 0.144% Mo and 1.95g/t Ag) from 0m to 693.4m.0.66% CuEq* over 58.00m (0.43% Cu, 0.054% Mo and 3.38g/t Ag) from 130.00m to 188.00m.0.95% CuEq* over 221.40m (0.03% Cu, 0.259% Mo and 0.41g/t Ag) from 472.00m to 693.40m.The complete set of results for A23-005 are summarized in Table 1 below. Results from drillhole A23-005 which was drilled approximately 317m WSW of A22-003 continue to confirm Aurora is a robust porphyry copper-molybdenum system with mineralization extending from 2628m elevation at surface to an elevation of approximately 2000m down hole. Once again, this drill hole ended in very good molybdenum mineralization.Mr. Gendall President and CEO commented: \"We've had another very encouraging copper-molybdenum intersection in drillhole A23-005. We have now stepped out 317m from A22-003 which was drilled on the eastern edge of the porphyry and we continue to expand the mineralized footprint to the west and at depth. Drilling is ongoing to the west of A23-005 and we have completed another two holes A23-006 and A23-007. Assay results are awaited for both holes.\"Aurora Cu-Mo Project - Summary of Drill Results for A23-005A23-005Hole A23-005, like A23-004 was drilled in an area of well exposed quartz-molybdenite veining at an angle of -70 degrees towards an azimuth of 140 degrees (Table 2, Figures 2, 3 and 4). The logged geology is summarized as follows:Leached quartz-eye feldspar porphyry (QEFP) from 0m to 20m.Partially leached QEFP from 20m to 130m.Mixed limonit...