Business
DLP Resources intersects 218m of 0.80% CuEq* within a 664.3m interval of 0.53% CuEq* on the Aurora Project in Southern Peru
Cranbrook, British Columbia--(Newsfile Corp. - January 5, 2023) - DLP Resources Inc. (TSXV: DL...

About this update from Dlp Resources, Inc.
[{"type":"text","content":"DLP Resources intersects 218m of 0.80% CuEq* within a 664.3m interval of 0.53% CuEq* on the Aurora Project in Southern PeruCranbrook, British Columbia--(Newsfile Corp. - January 5, 2023) - DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) (\"DLP\" or the \"Company\") announces receipt of complete drill results for the third hole, A22-003 on the Aurora porphyry copper-molybdenum project in southern Peru (Figure 1).Results for the first two drillholes, A22-001 and A22-002 were released on December 05, 2022 (see DLP Resources Inc. news release of December 05, 2022). HighlightsDrillhole A22-003 intersected significant copper-molybdenum mineralization from below the partially leached upper 38m down to the end of the hole at 702.30m. The most significant mineralized intervals included:664.30m at 0.33% Cu, 483.14ppm Mo and 3.23g/t Ag (0.53% CuEq*) from 38m to 702.30m.132.00m at 0.69% Cu, 161.77ppm Mo and 5.65g/t Ag (0.80% CuEq*) from 132.00m to 350m.92m at 0.83% Cu, 71.07ppm Mo and 6.81g/t Ag (0.92% CuEq*) from 258m to 350m.180.30m at 0.07% Cu, 1283.78ppm Mo and 0.53g/t Ag (0.53% CuEq*) from 522m to 702.3m.The complete set of results for A22-003 are summarized in Table 1 below. Results from drillhole A22-003 continue to confirm Aurora is a robust porphyry copper-molybdenum system with mineralization now confirmed to a vertical depth of 660m below a surface elevation of 2762m. To date this is the deepest drilled hole on the Aurora project.Mr. Gendall, President and CEO, commented: \"These significant copper and molybdenum results received for A22-003 are not a surprise as we expect to continue to expand the footprint of the Aurora copper-molybdenum porphyry both at depth and over the known surface dimensions of at least 1000m by 500m. Further drilling for the first six months of 2023 will be to the west and northwest of drillhole A22-003, covering an additional untested portion of the system.\" Aurora Cu-Mo Project - Summary of Drill Results for A22-003A22-003Hole A22-003 was drilled to the NE of the mapped porphyry and hornfels contact at an angle of 70 degrees towards an azimuth of 210 degrees (Table 2, Figures 2, 3 and 4). The logged geology is summarized as follows:No core recovery from 0.00m to 2.70m.Partially leached intrusive breccia and hornfels from 2.70m to 36m.Mixed limonitic zone of partially leached sulphides consisting mainly ...