Business

DLP Resources Intersects 198.90m of 0.98% CuEq* Within a 700.90m Interval of 0.72% CuEq* on the Aurora Project in Southern Peru

Cranbrook, British Columbia--(Newsfile Corp. - May 2, 2023) - DLP Resources Inc.  (TSXV: D...

articleDlp Resources, Inc.May 2, 20235/company/dlp-resources-inc/news/dlp-resources-intersects-19890m-of-098percent-cueq-within-a-70090m-interval-of-072percent-cueq-on-the-aurora-project-in-southern-peru
DLP Resources Intersects 198.90m of 0.98% CuEq* Within a 700.90m Interval of 0.72% CuEq* on the Aurora Project in Southern Peru

About this update from Dlp Resources, Inc.

[{"type":"text","content":"DLP Resources Intersects 198.90m of 0.98% CuEq* Within a 700.90m Interval of 0.72% CuEq* on the Aurora Project in Southern PeruCranbrook, British Columbia--(Newsfile Corp. - May 2, 2023) - DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) (\"DLP\" or the \"Company\") announces receipt of complete drill results for the fourth hole, A23-004 on the Aurora porphyry copper-molybdenum project in southern Peru (Figure 1).Results for the first three drillholes, A22-001, A22-002 and A22-003 were released on December 05, 2022 and January 05, 2023 (see DLP Resources Inc. news releases of December 05, 2022 and January 05, 2023). HighlightsDrillhole A23-004 intersected significant copper-molybdenum mineralization throughout the hole to a depth of 700.90m where it ended in very good molybdenum mineralization. The most significant mineralized intervals included:700.90m at 0.18% Cu, 0.142% Mo and 2.47g/t Ag (0.72% CuEq*) from 0m to 700.90m.222.10m at 0.46% Cu, 0.056% Mo and 5.88g/t Ag (0.72% CuEq*) from 110.90m to 333.00m.153.10m at 0.53% Cu, 0.058% Mo and 7.07g/t Ag (0.86% CuEq*) from 110.90m to 264.00m.198.90m at 0.02% Cu, 0.273% Mo and 0.17g/t Ag (0.98% CuEq*) from 502.00m to 700.90m.The complete set of results for A23-004 are summarized in Table 1 below. Results from drillhole A23-004 which was drilled approximately 256m WSW of A22-003 continue to confirm Aurora is a robust porphyry copper-molybdenum system with mineralization extending from 2638m elevation at surface to an elevation of approximately 2000m down hole. To date this is the deepest drilled hole on the Aurora project which ended in very good molybdenum mineralization.Mr. Gendall President and CEO commented: \"With a step-out of 256m from A22-003 we continue to intersect very good copper-molybdenum mineralization on the NW side of Aurora with mineralization open in all directions. Drilling is ongoing to the west of A23-004 covering an additional untested portion of the system. Drill hole A23-005 has been completed and we are awaiting results. We are currently drilling A23-006, 192m west of A23-004.\"Aurora Cu-Mo Project – Summary of Drill Results for A23-004A23-004Hole A23-004 was drilled in an area of well exposed quartz-molybdenite veining at an angle of -70 degrees towards an azimuth of 140 degrees (Table 2, Figures 2, 3 and 4). The logged geology is summariz...

More updates from Dlp Resources, Inc.