Business
GLOBAL MINERALS LTD. - EXPLORATION UPDATE
Mar. 2, 2011 (Canada NewsWire Group) -- VANCOUVER, March 2 /CNW/ - Global Minerals Ltd. ( CTG...

About this update from District Metals Corp.
[{"type":"text","content":"\n\n\n Mar. 2, 2011 (Canada NewsWire Group) -- \n\n#ReleaseContent TABLE\n{\n BORDER-COLLAPSE: collapse\n}\nTR.cnwUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 1px solid\n}\nTR.cnwDoubleUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 3px double\n}\nTR.cnwBoldUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 3px solid\n}\nTD.cnwUnderlinedCell\n{\n BORDER-BOTTOM: #000000 1px solid\n}\nTD.cnwDoubleUnderlinedCell\n{\n BORDER-BOTTOM: #000000 3px double\n}\nTD.cnwBoldUnderlinedCell\n{\n BORDER-BOTTOM: #000000 3px solid\n}\n#ReleaseContent TABLE.cnwBorderedTable TD\n{\n BORDER-RIGHT: black 1px solid;\n PADDING-RIGHT: 2px;\n BORDER-TOP: black 1px solid;\n PADDING-LEFT: 2px;\n PADDING-BOTTOM: 2px;\n BORDER-LEFT: black 1px solid;\n PADDING-TOP: 2px;\n BORDER-BOTTOM: black 1px solid;\n BORDER-COLLAPSE: collapse\n}\n#ReleaseContent TABLE TD\n{\n PADDING-RIGHT: 2px;\n PADDING-LEFT: 2px;\n PADDING-BOTTOM: 2px;\n PADDING-TOP: 2px\n}\n\n\nVANCOUVER, March 2 /CNW/ - Global Minerals Ltd. (CTG: TSX-V) is pleased to provide this update on exploration activities at its\n Strieborná silver-copper project in Slovakia.\n\n\nDrilling to Begin\n\n\nDrilling is expected to begin during mid-March. Permits have been\n approved pending required site inspection. A drilling contractor has\n been chosen and is ready to mobilize. Initial drilling will be from\n surface and designed to re-confirm high grade mineralization in the\n upper portion of the Strieborná vein, to test for extensions along\n strike and to test known parallel veins. Eight drill sites have been\n selected with an initial program of 3400 meters of core drilling\n planned in 12 holes. Follow-up surface drilling will be based on\n initial results.\n\n\nTo view a map of the proposed drill holes, please click the following\n link: http://files.newswire.ca/891/DH-map.pdf\n\n\nPermits to begin de-watering the underground tunnels are advanced.\n De-watering is expected to begin in the second quarter of this year\n with initial underground access during the second half. Once access is\n available underground drill stations will be rehabilitated and drilling\n will begin. Underground access will also provide the opportunity to\n collect bulk samples for metallurgical testing.\n\n\nRegional Exploration Leads to Expanded Claim Holding\n\n\nA regional compilation of geological, geophysical and geoche...