Business
Dios Exploration hits interesting copper drilling intercepts on K2 project, James Bay, Quebec
MONTREAL, Feb. 23, 2023 (GLOBE NEWSWIRE) -- Dios Exploration drilled significant copper intercepts in Fall program completed on October 21 on K2, James Bay, sou

About this update from Dios Exploration, Inc.
[{"type":"text","content":" MONTREAL, Feb. 23, 2023 (GLOBE NEWSWIRE) -- Dios Exploration drilled significant copper intercepts in Fall program completed on October 21 on K2, James Bay, southwest of favourable gold-bearing Patwon & Barrick shears in dacite (volcanics) and gabbro/quartz porphyry bodies. Copper metal is necessary to decarbonization and energy transition, such as lithium. Dios hit 35.2 m @ 1645 ppm Cu &1.93 g/t Ag and 28.5 m @ 1032 ppm Cu & 0.28 g/t Ag. Extensive one km long PP-5 conductor was well outlined by last Fall IP survey, also coincidental with Badji showing (5.05% copper 5.39 g/t gold, 111 g/t silver with cm pyrite-chalcopyrite stringers in foliated and strongly sericitized dacite) and historical SDBJ showing (1.08% Cu & 13.8 g/t Ag). PP-5 was tested by 6 holes (1 to 5 & 11) cutting several decametric silicified dacite with disseminated PY-PO-CPY (& stringers) and QFP (quartz-feldspar porphyry) with 1-5% disseminated (& stringers) pyrite. HOLE K2-22- FROM TO copper ppm gold (g/t) Silver (g/t) INTERVAL (M) ROCK TYPE MINERALIZATION 1 75.80 76.30 1015 0.193 1.9 0.50 QFP 3% Pyrite stringers 1 166.35 166.85 312 0.195 1.5 0.50 DACITE 5% PY stringers 1 206.00 206.50 500 0.243 1.2 0.50 QFP 2% PY disseminated 2 171.50 172.00 645 0.139 0.9 0.50 GABBRO 3% PY 1% ChalcoPyrite 3 15.76 51.00 1645 0.013 1.93 35.24 DACITE 1% PY, TR-1% CPY 3 27.00 28.05 5870 0.060 6.0 1.05 DACITE 1% PY, 1-2% CPY 3 48.00 49.00 8490 0.086 10.1 1.00 DACITE 1% PO, 1-2% CPY 3 206.00 206.50 96 0.424 0.4 0.50 DACITE 1% PY, TR-CPY 4 8.00 36.50 1032 0.024 1.28 28.50 DACITE 1% PO, TR-1% CPY 4 19.80 20.55 3400 0.141 4.7 0.75 DACITE 1-2% PO-PY, 1%CPY 5 111.00 129.15 0.005 28.15 QFP SIlica++ 4-5% PY 11 117.75 156.85 0.005 39.10 QFP SIlica- BO- 1-5%PY 11 169.60 170.35 2350 0.057 0.75 QFP 20%PO 5%CPY strgs Hole 10 hit 3.64g/t gold, 1.11g/t silver, 0.55% zinc over 0.5 m in volcanic tuff with 1-2% PO-SP (-CPY) stringers (120-120.5 m depth) along 400 m-long PP-10 IP conductor. Such tuff represents a volcanism break, follow-up should be pursued this horizon extent. Some 600m west of PP-10 and 300 m south of PP-5, 800m-long PP-9 conductor in strike with Shiva showings yielded 2.12 gold and 1.35g/t Au f...