Business

Denison Reports Results From Phoenix ISR Field Tests Confirm Ability to Achieve Hydraulic Conductivity Values Consistent With Pre-Feasibility Study

Denison Reports Results From Phoenix ISR Field Tests Confirm Ability to Achieve Hydraulic ...

articleDenison Mines Corp.February 24, 20204/company/denisonmines/news/denison-reports-results-from-phoenix-isr-field-tests-confirm-ability-to-achieve-hydraulic-conductivity-values-consistent-with-pre-feasibility-study
Denison Reports Results From Phoenix ISR Field Tests Confirm Ability to Achieve Hydraulic Conductivity Values Consistent With Pre-Feasibility Study

About this update from Denison Mines Corp.

[{"type":"text","content":"\n\n\n\nDenison Reports Results From Phoenix ISR Field Tests Confirm Ability to Achieve Hydraulic Conductivity Values Consistent With Pre-Feasibility Study\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prntal{\nTEXT-ALIGN: LEFT\n}\n\n\n\n\n\n\n\nCanada NewsWire\nTORONTO, Feb. 24, 2020\n\n\n\n\nTORONTO, Feb. 24, 2020 /CNW/ - Denison Mines Corp. (\"Denison\" or the \"Company\") (DML: TSX, DNN: NYSE American) is pleased to report that the results from hydrogeological test work, completed in 2019 at the high-grade Phoenix uranium deposit (\"Phoenix\"), have confirmed the ability to achieve bulk hydraulic conductivity values (a measure of permeability) consistent with the Pre-Feasibility Study (\"PFS\") completed for the Company's 90% owned Wheeler River Uranium Project (\"Wheeler River\"), located in northern Saskatchewan, Canada.  View PDF version\nDuring the summer and fall months of 2019, Denison collected an extensive database of hydrogeological data as part of an In-Situ Recovery (\"ISR\") field test program (the \"2019 Field Test\") at Phoenix.  The 2019 Field Test was designed to further evaluate the ISR mining conditions present at Phoenix and is expected to support the completion of a future Feasibility Study (\"FS\") (see Denison's press release dated December 18, 2019 for additional details regarding the 2019 Field Test).\nA key element of the 2019 Field Test was the completion of various pump and injection tests in two large diameter commercial scale wells (\"CSWs\") installed within the Phoenix orebody. These tests were designed to allow for the simulation of fluid flow under conditions similar to an envisioned commercial ISR production environment – ultimately facilitating a quantitative assessment of the bulk hydraulic conductivity of the Phoenix orebody and surrounding rock formations.  For ISR mining operations, the term \"hydraulic conductivity\" is used to describe the ease with which a fluid can move through the pore spaces or fractures within a host rock. Hydraulic conductivity, commonly represented by the symbol \"K\", is often st...

More updates from Denison Mines Corp.