Business
Delta Further Increases Its Gold Inventory at Delta-1 with Intercepts of 2.27 h/t over 10 Metres and 2.20 g/t over 9 Metres, in Thunder Bay, Ontario
Kingston, Ontario--(Newsfile Corp. - November 21, 2023) - Delta Resources Limited (TSXV: DL...

About this update from Delta Resources Limited
[{"type":"text","content":"Delta Further Increases Its Gold Inventory at Delta-1 with Intercepts of 2.27 h/t over 10 Metres and 2.20 g/t over 9 Metres, in Thunder Bay, OntarioKingston, Ontario--(Newsfile Corp. - November 21, 2023) - Delta Resources Limited (TSXV: DLTA) (OTC Pink: DTARF) (FSE: 6GO1) (\"Delta\" or \"the Company\") is pleased to provide additional final assay results from its second phase of drilling, previously announced on June 6, 2023, at the Delta-1 Gold project located 50 km west of Thunder Bay, Ontario.Results from the final fifteen (15) drill holes of the second phase drill program are provided in Table 1 below. Other results from the forty-eight (48) drill holes comprising this phase of drilling were released on September 12, 2023 and October 5, 2023.and October 23, 2023.Highlights:Depth Extension at Delta-1 (Figure 2):D1-23-72 intersected 1.49 g/t Au over 18.9 metres including 2.27 g/t Au over 10.0 metres.Including a three-metre interval grading 5.20 g/t Au,This intersection extends the Beta Zone to a vertical depth of 285 metres, 100 metres east of drill hole D1-23-86. D1-23-86 intersected 0.64 g/t Au over 58.7 metres including 2.20 g/t Au over 9.0 metresThis intersection extends the Beta Zone to a vertical depth of 240 metres 100 metres west of drill hole D1-23-72. Hole D1-23-86 also intersected 9.66 g/t Au over 1.5 metres at a vertical depth of approximately 365 metres.Increased Gold Inventory at Delta-1; Gamma Zone Near Surface Extended for 200 metres (Figure 1):D1-23-77 intersected 1.05 g/t Au over 11.5 metres,D1-23-78 intersected 0.54 g/t Au over 23.5 metres from 6.0 metres. These intersections extend the Gamma Zone for a surface strike length off 200 metres to date. Drill holes D1-23-77 and 78 were drilled respectively 100 metres east and west of drill hole D1-23-53: 1.18 g/t Au over 42.0 metres (September 12, 2023).Eastern Extension of Gold mineralization and alteration corridor (Figure 1):D1-23-73 intersected 0.50 g/t Au over 6.5 metres, and D1-23-74 intersected 0.49 g/t Au over 15.50 metres.Both these drill holes are located on a section 846 metres east of hole D1-23-38: 1636 g/t Au and 697 g/t Au over 1.0 metres each (May 11, 2023), showing the potential for new mineralized zones east of the currently defined gold zone. D1-23-76 is located 1.15 kilometres east of hole D1-23-38 and intersected the alter...