Business
Delta Drills 4.18 g/t Au over 17.7 Metres at Eureka and Initiates First Phase of Comprehensive Metallurgical Test Work Program at the Delta-1 Gold Project, Thunder Bay, Ontario
Toronto, Ontario--(Newsfile Corp. - February 18, 2026) - Delta Resources Limited (TSXV: DLTA) (OTC Pink: DTARF) (FSE: 6GO1) ("Delta" or "the Company") is pleased to report assay results from the remaining two holes of its Fall 2025 drilling program and to announce the initiation of a comprehensive preliminary metallurgical test work program at the Delta-1 Project in Thunder Bay, Ontario. Highlights:4.18 g/t Au over 17.7 metres in hole D1-25-1450.91 g/t Au over 16.1 metres in hole...
About this update from Delta Air Lines, Inc.
[{"type":"text","content":"Toronto, Ontario--(Newsfile Corp. - February 18, 2026) - Delta Resources Limited (TSXV: DLTA) (OTC Pink: DTARF) (FSE: 6GO1) ("Delta" or "the Company") is pleased to report assay results from the remaining two holes of its Fall 2025 drilling program and to announce the initiation of a comprehensive preliminary metallurgical test work program at the Delta-1 Project in Thunder Bay, Ontario.","length":425,"tagName":"p"},{"type":"text","content":"Highlights:","length":11,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"4.18 g/t Au over 17.7 metres in hole D1-25-145","length":46,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"0.91 g/t Au over 16.1 metres in hole D1-25-146","length":46,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"Initiation of a comprehensive preliminary metallurgical test work program","length":73,"tagName":"p","attribs":{}}]}],"tagName":"ul","bulletedList":true,"length":165,"olType":false},{"type":"text","content":"The drill holes were designed to support early-stage technical evaluation through infill drilling, while also providing new material for the metallurgical test work program. The holes were strategically positioned within the core of the Eureka Gold Deposit to serve this dual purpose (Figure 1). The results confirm the lateral continuity of mineralization between previous drill holes, an important step in increasing confidence in the mineralization as the Company continues to de-risk the Eureka Gold Deposit.","length":512,"tagName":"p"},{"type":"text","content":"Assay results include 4.18 g/t Au over 17.7 metres, 0.74 g/t Au over 11.7 metres, and 0.89 g/t Au over 13 metres in hole D1-25-145, and 0.91 g/t Au over 16.1 metres and 1.14 g/t Au over 7.3 metres in hole D1-25-146 (Table 1). Both holes were drilled approximately 40 metres from the nearest previously completed hole. Nearby intercepts from prior Delta drilling include 5.92 g/t Au over 31 metres (D1-22-018) and 1.79 g/t Au over 128.5 metres (D1-23-060).","length":455,"tagName":"p"},{"type":"text","content":"Additional material for metallurgical testing was sourced from available coarse assay rejects from previous drill programs. For the complete table of results from the Fall 2025 drill program, please refer to Table 2.","length":216,"tagName":"p"},{"type":"t...