Business
Ridgeline Minerals Reports Additional Assays for the Chinchilla Sulfide CRD Discovery at the Selena Project, Nevada
Vancouver, British Columbia--(Newsfile Corp. - December 18, 2025) - Ridgeline Minerals Corp. (TSXV: RDG) (OTCQB: RDGMF) (FSE: 0GC0) ("Ridgeline" or the...
About this update from Ridgeline Minerals Corp
[{"type":"text","content":"Vancouver, British Columbia--(Newsfile Corp. - December 18, 2025) - Ridgeline Minerals Corp. (TSXV: RDG) (OTCQB: RDGMF) (FSE: 0GC0) ("Ridgeline" or the "Company") is pleased to announce additional assay results for discovery drillhole SE25-053 at the Selena project ("Selena" or "Project") in Nevada. The lower sulfide horizon was intersected 94 meters beneath the previously announced upper zone discovery and returned a highlight intercept of 8.7 meters ("m") grading 175.5 g/t silver equivalent ("AgEq") or 7.3% zinc equivalent ("ZnEq") starting at 1,069m downhole (Figure 1 & Picture 1).","length":675,"tagName":"p"},{"type":"text","content":"Chad Peters, Ridgeline's President, CEO & Director commented, "Discovery hole SE25-053 has exceeded our expectations for a maiden drill program, intersecting three high-grade CRD horizons with a cumulative mineralized thickness of 27.2 meters. We are especially encouraged to have hit multiple stacked sulfide lenses in a single hole, which show evidence of base metal zoning and further support our interpretation that Selena hosts a multi-phase CRD system with significant growth potential."","length":511,"tagName":"p"},{"type":"text","content":"Mr. Peters continues "We are still in the early days of a new discovery but with individual samples grading up to 27% zinc and 379 g/t silver, we believe Selena has the potential to deliver even higher grades as we continue to vector into the core of the CRD system. Follow up drillhole SE25-054 is in progress with assay results to be released as they are received in 2026." ","length":385,"tagName":"p"},{"type":"text","content":"SE25-053 Highlights","length":19,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"1.1m grading 27.0% Zn, 60.1 g/t Ag, 0.7% Pb, 1.5 g/t Au, 0.4% Cu, 0.03% Sb (766.4 g/t AgEq or 31.9% ZnEq) starting at 943m downhole, true thickness unknown (Figure 2)","length":166,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"And: 17.4 meters grading 6.0% Zn, 35.6 g/t Ag, 0.5% Pb, 0.2 g/t Au, 0.1% Cu, 0.1% Sb (219.9 g/t AgEq or 9.2% ZnEq) (Figure 2 & Picture 2)","length":141,"tagName":"p","attribs":{}},{"type":"list","items":[{"val":[{"type":"text","content":"Including: 8.6 meters grading 10.4% Z...