Business

Core Assets Drills 11.8M of Massive Zn-Cu-Ag Sulphide at Silver Lime

VANCOUVER, BC / ACCESSWIRE / August 7, 2024 / Core Assets Corp., ("Core Assets" or the "Company") (CSE:CC) (FSE:5RJ) (OTC.QB:CCOOF) is pleased to present an exp

articleCore Silver Corp.August 7, 20243/company/core-assets-corp/news/core-assets-drills-118m-of-massive-zn-cu-ag-sulphide-at-silver-lime
Core Assets Drills 11.8M of Massive Zn-Cu-Ag Sulphide at Silver Lime

About this update from Core Silver Corp.

[{"type":"text","content":" VANCOUVER, BC / ACCESSWIRE / August 7, 2024 / Core Assets Corp., (\"Core Assets\" or the \"Company\") (CSE:CC) (FSE:5RJ) (OTC.QB:CCOOF) is pleased to present an exploration update that includes visual results from diamond drill core collected from the Sulphide City Porphyry-Skarn Target and Whaleback Skarn Showing at the Silver Lime CRD-Porphyry Project (the \"Silver Lime Project\" or \"Silver Lime\"), central Blue Property (the \"Blue Property\"), Atlin Mining District of NW British Columbia. HIGHLIGHTS 2,014 metres of diamond drilling (HQ/NQ) has been completed across three (3) locations at the Silver Lime Project in 2024 (Table 2, Figure 3). Drill holes SLM24-060 through 062 were planned to test the near surface and high-grade Zinc Skarn Showing at the Sulphide City - Whaleback Target (See News Release dated February 14, 2022). In 2021, channel sampling was completed over 4 locations along a north-northwest trend at Whaleback and returned 5.3 metres of 10.2% Zn, 0.29% Cu. 14g/t Ag. (CH21-02: Table 1): SLM24-060: Intersected multiple zones of massive sulphide skarn mineralization, totalling 11.6m combined length, from surface to approximately 39 metres depth and ended in endoskarn-style alteration (Figure 2). SLM24-061: Intersected 11.8m of continuous sphalerite-rich (Zn) massive sulphide exoskarn mineralization with chalcopyrite (Cu) and galena (Pb/Ag) from surface (Figure 1). SLM24-062: Obliquely intersected approximately 0.5m of massive sulphide skarn mineralization as well as an intense fault zone interpreted as the feeder structure to the Whaleback Skarn system (Figure 2). Figure 1: A photograph of the continuous 11.8-metre interval of massive sulphide (sphalerite-pyrrhotite-pyrite+/-chalcopyrite-galena-rich) skarn mineralization in Sulphide City-Whaleback hole SLM24-061. SLM24-057: Designed to test the Sulphide City Porphyry, immediately north of the 2022 collar location. The hole encountered disseminated to locally semi-massive sphalerite-chalcopyrite-galena-bearing skarn alteration from surface to approximately 450 metres depth - marking the contact between surrounding metasedimentary country rock and the Sulphide City Mo-Cu-Porphyry (Figure 2). Hole 057 was the first hole completed this season and deviated from the intended drilling direction due to intense faulting and repetitive differences in rock competency withi...

More updates from Core Silver Corp.