Business

Cordoba Minerals Completes Initial In-fill Drilling Program and Confirms High-Grade Copper-Gold Mineralization Within the Core of the Alacran Deposit at its 100%-owned San Matias Copper-Gold-Silver Project in Colombia

ACD157 Reports 95.4 Metres* of 1.49% Copper Equivalent 1 (1.31% Copper, 0.38 g/t Gold and 7.59 g...

articleCordoba Minerals Corp.January 23, 20234/company/cordoba-minerals-corp/news/cordoba-minerals-completes-initial-in-fill-drilling-program-and-confirms-high-grade-copper-gold-mineralization-within-the-core-of-the-alacran-deposit-at-its-100percent-owned-san-matias-copper-gold-silver-project-in-colombia
Cordoba Minerals Completes Initial In-fill Drilling Program and Confirms High-Grade Copper-Gold Mineralization Within the Core of the Alacran Deposit at its 100%-owned San Matias Copper-Gold-Silver Project in Colombia

About this update from Cordoba Minerals Corp.

[{"type":"text","content":"Cordoba Minerals Completes Initial In-fill Drilling Program and Confirms High-Grade Copper-Gold Mineralization Within the Core of the Alacran Deposit at its 100%-owned San Matias Copper-Gold-Silver Project in ColombiaACD157 Reports 95.4 Metres* of 1.49% Copper Equivalent1 (1.31% Copper, 0.38 g/t Gold and 7.59 g/t Silver)Vancouver, British Columbia--(Newsfile Corp. - January 23, 2023) - Sarah Armstrong-Montoya, President and Chief Executive Officer of Cordoba Minerals Corp. (TSXV: CDB) (OTCQB: CDBMF) (otherwise \"Cordoba\" or the \"Company\"), is pleased to report remaining assay results received from the initial in-fill drilling program at the 100%-owned San Matias Copper-Gold-Silver Project.Highlights:Significant intercepts returned from the remaining initial in-fill drill holes include (Table 1):ACD156 - 91.7 metres* (\"m\") from 56.5 m to 148.2 m with 1.05% copper (\"Cu\"), 0.86 g/t gold (\"Au\") and 9.50 g/t silver (\"Ag\"), or 1.55% copper equivalent1 (\"CuEq\"), including:46.90 m from 65.5 m to 112.4 m with 1.72% Cu, 0.55 g/t Au and 16.23 g/t Ag, or 2.02% CuEq1.ACD157 - 95.4 m* from 32.9 m to 128.3 m with 1.31% Cu, 0.38 g/t Au and 7.59 g/t Ag, or 1.49% CuEq1, including:28.1 m from 32.9 m to 61 m with 1.42% Cu, 0.23 g/t Au and 5.90 g/t Ag, or 1.49% CuEq1,44 m from 84.3 m to 128.3 m with 1.79% Cu, 0.62 g/t Au and 11.96 g/t Ag, or 2.11% CuEq1.Initial in-fill drill results confirm the strong correlation with the Pre-Feasibility Study (\"PFS\") block model and will be included in an updated mineral resource model.\"With the completion of the initial in-fill drilling program, I'm delighted that the assay results consistently demonstrated high-grade copper-gold mineralization within the core of the Alacran Project,\" commented Ms. Sarah Armstrong-Montoya, President and CEO of Cordoba. \"Together with the participation of JCHX in the Project and the advancing of the Feasibility Study work program, we look forward to an encouraging year for the development of the Alacran Deposit.\" Initial in-fill drilling confirms the correlation with the PFS block model and Carbonate Base Metal veins offer significant upside for contained gold in the Alacran Deposit.Cordoba has completed 27,726 m in 142 diamond drill holes for the initial in-fill drilling campaign. Assay results from the remaining drill holes continue to demonstrate high-grade co...

More updates from Cordoba Minerals Corp.