Business

Cogitore Intersects 3.12% Copper over 4.4 metres at the Estrades Project

Cogitore Intersects 3.12% Copper over 4.4 metres at the Estrades Project.

articleCopper Road Resources IncMay 8, 20073/company/copper-road-resources-inc/news/cogitore-intersects-312percent-copper-over-44-metres-at-the-estrades-project
Cogitore Intersects 3.12% Copper over 4.4 metres at the Estrades Project

About this update from Copper Road Resources Inc

[{"type":"text","content":"\n\n\n\nTORONTO, May 8 /CNW/ - COGITORE Resources Inc. (the "Company") (WOO:\nTSX-V) is pleased to report encouraging results from its recently completed\nwinter drilling program at the Estrades project. A deep hole below the East\nZone intersected a 23 metre thick zone of copper mineralization hosted by\nstrongly chloritized felsic volcanics. Assay results are shown below:\n\n\nASSAYS - DDH EME-07\n-------------------\n\n-----------------------------------------------------\nFROM TO LENGTH CU ZN AU AG\n(m) (m) (m) % % ppb g/t\n831.90 855.10 23.20 0.84 0.02 37 7.62\n\nIncluding\n---------\n834.40 834.90 0.50 4.01 0.04 46 50.00\n\nand\n850.70 855.10 4.40 3.12 0.02 100 20.89\n\nthe above 4.40 metre interval includes:\n---------------------------------------\n854.50 855.10 0.60 7.36 0.02 112 51.70\n-----------------------------------------------------\n\n\nThe hole was drilled down plunge of the "East Zone" about one kilometre\nto the east of the Main Zone (currently the subject of a feasibility study)\nand was drilled to follow up borehole pulse electromagnetic geophysical survey\n(PEM) responses in adjacent holes.\n\n\nCompany President Gerald Riverin, Ph.D., P. Geo. commented "This\ncopper-rich mineralized zone represents one of the best overall intersections\nof copper to date at the Estrades project and is typical of stringer\nmineralization that is normally found proximal to massive sulphide vent areas.\nA prior hole drilled in 1989 (H-293), located 190 metres up-dip of EME-07,\nintersected 0.91% Cu over 9.2 metres within what appears to be the same zone\n(see attached longitudinal section:\nhttp://files.newswire.ca/512/EstradesLong_Cogitore.pdf). If the interpreted\nlinkage between holes proves correct, it suggests improvement in copper\ncontent downward within a quite extensive mineralized zone. The East Sector\nwill be the focus of our next drilling campaign at Estrades. A borehole PEM\nsurvey in drill hole EME-07 suggests a moderate 'edge'-type anomaly coinciding\nwith the copper stringer mineralization. Follow-up work will include\nadditional borehole geophysics and diamond drilling."\n\n\nThe 2007 winter drilling program also included one hole to test the\ncontinuity of the Estrades Mine "Main East" Zone, two holes to test a felsic\nhorizon about 600m to the north of the Estrades ...

More updates from Copper Road Resources Inc