Business

Copper Giant Announces the 2026 Exploration Plan, Targeting 23,000 metres of Drilling, the Largest Drilling Program in the History of The Mocoa Project

Copper Giant Resources Corp. ("Copper Giant" or the "Company") (TSXV: CGNT) (OTCQB: LBCMF) (FRA: 29H0) is pleased to announce its 2026 Exploration Program, which is anticipated to be the Company's largest drilling campaign to date at the Mocoa Project, located in Putumayo, Colombia. Mocoa is a Jurassic age porphyry Cu-Mo deposit. Drilling to date has delineated continuous copper and molybdenum mineralization from surface to depth exceeding 1,000 vertical metres. This year's program comprises app

articleCopper Giant Resources CorpFebruary 17, 202611/company/copper-giant-resources-corp/news/copper-giant-announces-2026-exploration-123000850
Copper Giant Announces the 2026 Exploration Plan, Targeting 23,000 metres of Drilling, the Largest Drilling Program in the History of The Mocoa Project

About this update from Copper Giant Resources Corp

[{"type":"text","content":"VANCOUVER, BC, Feb. 17, 2026 /CNW/ - Copper Giant Resources Corp. ("Copper Giant" or the "Company") (TSXV: CGNT) (OTCQB: LBCMF) (FRA: 29H0) is pleased to announce its 2026 Exploration Program, which is anticipated to be the Company's largest drilling campaign to date at the Mocoa Project, located in Putumayo, Colombia. Mocoa is a Jurassic age porphyry Cu-Mo deposit. Drilling to date has delineated continuous copper and molybdenum mineralization from surface to depth exceeding 1,000 vertical metres. This year's program comprises approximately 23,000 metres of high-impact, cost-effective directional drilling and is designed to significantly advance the project toward the level of technical confidence required to support a future Preliminary Economic Assessment ("PEA") level evaluation. The primary objectives of the 2026 drill program are to expand the current Mineral Resource Estimate1 ("MRE") footprint, test new district-scale targets, and potentially upgrade Inferred Mineral Resources to the Indicated category.","length":1084,"tagName":"p"},{"type":"text","content":"Highlights of the proposed 2026 Exploration Plan: ","length":49,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Approximately 23,000 metres of planned drilling, representing an increase of more than 80% compared to the 2025 drilling campaign, marking the Company's largest exploration program to date and supporting advancement toward PEA-level project evaluation.","length":261,"tagName":"p"}]},{"val":[{"type":"text","content":"Fully funded, balanced, flexible, and cost-effective exploration program, designed to dynamically allocate drill metres across multiple high-priority objectives:","length":166,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":427,"olType":false},{"type":"text","content":"1. MRE Footprint Expansion: Step-out drilling aimed at expanding the current Mineral Resource Estimate1 ("MRE")  footprint toward the margins of the porphyry system, where geological limits remain undefined. With the objective of improving overall grade, priority will be placed on under-drilled areas within the constrained MRE shell, as well as on extending the three recognized high-grade zones. 2. Regional Target Testing: Drill testing of multiple pri...

More updates from Copper Giant Resources Corp

The Companydirectional drillingCopper Giant Resources Corp.MocoaCopper Giantexploration programMineral ResourceMocoa ProjectMineral Resource EstimateMRECompanyPEA