Business
Copper Fox Announces Final Analytical Results from Re-Sampling Program at Van Dyke Copper Deposit
Calgary, Alberta--(Newsfile Corp. - May 7, 2019) - Copper Fox Metals Inc. (TSXV: CUU) (OTC...

About this update from Copper Fox Metals Inc.
[{"type":"text","content":"Copper Fox Announces Final Analytical Results from Re-Sampling Program at Van Dyke Copper DepositCalgary, Alberta--(Newsfile Corp. - May 7, 2019) - Copper Fox Metals Inc. (TSXV: CUU) (OTC Pink: CPFXF) (\"Copper Fox\" or the \"Company\") and its wholly owned subsidiary, Desert Fox Copper Inc. (\"Desert Fox\"), are pleased to announce the final results for the re-analytical program on the Van Dyke oxide copper deposit (see news release January 23, 2019). Van Dyke is an In-Situ Leach (\"ISL\") project where the commodity of interest is acid soluble copper (\"ASCu\"). Highlights:DDH-OXY-18 returned an average of 0.284% ASCu over a 199.95m core interval including a 21.03m interval grading 1.141% ASCu. DDH-OXY-5 returned an average of 0.510% ASCu over a 33.53m interval including 0.931% ASCu over 13.71m and an average of 0.350% ASCu over a core interval of 57.91m including 1.046% ASCu over 10.67m. 20 of the 25 drill holes re-analyzed returned higher (3 to 260%) ASCu concentrations and 19 drill holes returned thicker (1.0 to 62.7m) mineralized intervals when compared to the original data base.The ASCu/TCu ratio for all samples analyzed averaged 86% in 2019 compared to 71% in the original data base. Elmer B. Stewart, President and CEO of Copper Fox, stated, \"The increased ASCu/TCu ratio combined with the higher ASCu concentrations and thicker mineralized intervals are encouraging. The full impact of these factors will only be known when additional sampling has been completed. Updating of the geological model for the Van Dyke deposit is underway and the additional sampling required to define the full extent (thickness) of the mineralized intervals is expected to commence immediately. Contingent on the results of these activities, Copper Fox may assess the possibility of completing an updated resource estimate for the project.\"The weighted average ASCu concentrations for the drill holes reported in this news release are:DDHFromToInterval2019Original 2019OriginalAcid SolubleIDAziDip(m)(m)(m)TCu (%)TCu (%)ASCu (%)ASCu (%)2019/Original (%)OXY-180-90400.51600.46199.950.2830.2310.2840.189150%including 421.54442.5721.031.1501.0561.1410.994115%OXY-310-90524.26553.2128.950.2400.2430.1050.13876%VD-50-90417.27450.8033.530.5400.5490.5100.506101%including 418.80432.5113.710.9881.0050.9310.94798%524.56582.4757.910.5030.5160.3500.325108%including 567....