Business
Jourdan Acquires Strategic Phosphate Showings Adjacent To Dissimieux Lake Phosphate Project by Staking
Jourdan Acquires Strategic Phosphate Showings Adjacent To Dissimieux Lake Phosphate Project by...

About this update from Consolidated Lithium Metals Inc
[{"type":"text","content":"\nJourdan Acquires Strategic Phosphate Showings Adjacent To Dissimieux Lake Phosphate Project by Staking\n\nJourdan Acquires Strategic Phosphate Showings Adjacent To Dissimieux Lake Phosphate Project by Staking\nNOT FOR DISTRIBUTION TO U.S. NEWSWIRE OR FOR DISSEMINATION IN THE UNITED STATES\n* Dissimieux Lake Phosphate Property now covers 240.5 km2\n* Several showings staked with values of up to 5.6% P2O5\n* Previous claims holders were engaged in titanium or copper-nickel exploration\n* Jourdan at PDAC 2013\nMississauga (Canada), March 1, 2013: JOURDAN RESOURCES INC. (TSX-V: JOR) (\"JOURDAN\" or the \"Company\") (www.jourdan.ca) is pleased to report that it has staked 25.5 km2 of new claims covering strategically located phosphate showings in the Dissimieux Lake region, bringing the total Dissimieux Lake claim block to 240.5 km2. \nIn addition to the focused drilling on the Dissimieux Lake Phosphate mineralized zones, Jourdan  has undertaken a systematic study of regional targets within the Dissimieux Lake area, resulting in this additional staking. These new targets, which will be the focus of future exploration are listed in the table below and shown on the map that can be found at: http://jourdan.ca/pdf/20130228JOR-Showings.pdf  \nMichael Dehn, Jourdan's President and CEO states,\"As these strategically located claims became available, Jourdan staked them with a minimal cost of acquisition.  With the Fleury occurrences being located in close proximity to the main access road in the region, and with the grades reported by Sigeom, these new occurrences make the Dissimieux Lake Phosphate Project an even more attractive project.\" \nThis new staking is the fourth round of staking since the original 8.3 km2 claim block was acquired by Jourdan in 2010. A map showing the progressive expansion of the Dissimieux Lake block can be viewed at http://jourdan.ca/pdf/20130228JORCLAIMS.pdf. \n\"The company has plans to continue exploration on the Dissimieux Lake Phosphate Property, and these additional claims and showings will be integrated into our ongoing exploration planning,\" states Stephen Wallace, Jourdan's VP Exploration. \"The recent successful drilling on the Main Phosphate Horizon, demonstrates a potentially large mineralized system over many kilometres and these new showings suggest additional explo...