Business
Colibri Confirms New Drill Targets on Pilar Property Using 3D Modelling Software
Colibri Confirms New Drill Targets on Pilar Property Using 3D Modelling Software C...

About this update from Colibri Resource Corporation
[{"type":"text","content":"\n\n\n\n\nColibri Confirms New Drill Targets on Pilar Property Using 3D Modelling Software\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n\n\n\n\n\n\n\nCanada NewsWire\nDIEPPE, NB, Nov. 14, 2017\n\n\n\nDIEPPE, NB, Nov. 14, 2017 /CNW/ - (CBI: TSX-V) Colibri Resource Corporation (\"Colibri\") is pleased to announce that it has created and confirmed a model to delineate drill targets on the Pilar property. Colibri hired international consultant and geologist PJ Lafleur to work with Hector Mendivil, a 3D software (ArcGIS TARGET) specialist in Hermosillo.  Under Colibri's country manager and geologist, Jackie E. Stephens, a model was created pertaining to the existing 2 gold trends on the Pilar Gold Project.  \n\nStephens, a graduate-student of the University of Arizona under Dr. John Guilbert, with 50 years of world-wide mineral exploration experience, has determined several new drill-targets at the Pilar.  \n\nStephens states that there are blocks of Tarajumara Cretaceous Andesites at the surface, with later Rhyolite dikes intruding the Andesites.  These volcanics are bordered on the west by a large Granordiorite batholith and it is thought to be under the Andesites. The gold mineral of interest is at the horizontal top of the Granodiorite and the bottom of the Andesites, and upward along near vertical northwesterly trending structures within the Andesite blocks.  \n\nThe gold is directly associated with reddish colored anomalies caused by the oxidation of pyrite. It is assumed that the gold is associated with the pyrite, and considering the +90% recovery of gold, it is also assumed to be on the surface of the pyrite and not encapsulated.  This being so, the geophysical high \"chargeability\" anomalies shown by the SJ Geophysics Report make good drilling targets.  These targets will also be tested.\n\nIt has been assumed in the past that the main NE Fault structure at the center of the gold mineralization on the Pilar Project of interest is a \"strike-slip\" fault, and the North Hill Mineralization is a right-lateral extension of the S...