Business
Clean Air Metals Announces New Step-out Drill Results from the Escape Lake Intrusion at Thunder Bay North, including 96.0m of 1.22g/t Platinum, 1.63g/t Palladium, 0.61% Copper, and 0.34% Nickel
Clean Air Metals Announces New Step-out Drill Results from the Escape Lake Intrusion at Th...

About this update from Clean Air Metals, Inc.
[{"type":"text","content":"\n\n\n\nClean Air Metals Announces New Step-out Drill Results from the Escape Lake Intrusion at Thunder Bay North, including 96.0m of 1.22g/t Platinum, 1.63g/t Palladium, 0.61% Copper, and 0.34% Nickel\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n\n\n\n\n\n\n\nCanada NewsWire\nTHUNDER BAY, ON, Aug. 20, 2020\n\n\n\nTHUNDER BAY, ON, Aug. 20, 2020 /CNW/ - Clean Air Metals Inc. (\"Clean Air Metals\" or the \"Company\") (TSXV: AIR) (OTCQB: CLRMF) is pleased to announce new assay results from the drilling campaign currently underway at the Company's 100%-owned Thunder Bay North Project (the \"Project\"). \nNew results from Drill Holes ELR20-008, -009, -010, and -014 in the Escape Lake Intrusion portion of the Project (\"Escape Lake\") complement those previously announced on June 17, June 29, and July 15, 2020, and are part of a 20,000m drill programs (Table 1). \nThe new tranche of assays includes Drill Hole ELR20-008 which intersected 96.0m of 1.22g/t Platinum, 1.63g/t Palladium, 0.61% Copper and 0.34% Nickel from 326.8m-423.0mm downhole, including 18m of 2.29g/t Platinum, 3.2g/t Palladium, 1.17% Copper and 0.76% Nickel from 391.8m-410.0m downhole.\nELR20-008 is a 50m step-out north from previously reported Drill Hole ELR20-003 (reported June 17, 2020) that returned an assay interval of 78.9m of 1.66g/t Platinum, 2.17g/t Palladium, 0.80% Copper and 0.41% Nickel from 359.5m-438.4m downhole, including 20.0m of 3.30g/t Platinum, 4.49g/t Palladium, 1.54% Copper and 0.84% Nickel from 395.5m-415.5m downhole (Figure 1).\nAbraham Drost, CEO of Clean Air Metals stated that \"the assay results from Drill Hole ELR20-008 extends the strike length of the deposit to the north at a greater thickness than the original Rio Tinto discovery holes. Holes 009 and 010 intersected mineralization over intervals of up to 14m likely defining the lateral edges of the mineralized conduit. \nIt is encouraging that drill targeting, based on previous drill results and recent geophysics, has allowed us to accurately identify a high-grade core as seen in previous Drill Hole ELR20-004 (r...