Business
Champion Bear Resources Announces Drilling Results From Eagle Rock Copper-PGE Project
Drill Hole ER19-24 intersected 7.5 m of 0.548 g/t Pd, 0.323 g/t Pt, 0.250 g/t Au with 0.40% Cu from 101.0 m to 108.5 m. Drill Hole ER19-25 intersected 10.0 m of

About this update from Champion Bear Resources Ltd.
[{"type":"text","content":" Drill Hole ER19-24 intersected 7.5 m of 0.548 g/t Pd, 0.323 g/t Pt, 0.250 g/t Au with 0.40% Cu from 101.0 m to 108.5 m. Drill Hole ER19-25 intersected 10.0 m of 0.645 g/t Pd, 0.398 g/t Pt, 0.325 g/t Au with 0.45% Cu from 75.0 m to 85.0 m. includes three 2 m long intervals with over 0.9 g/t Pd. Drill Hole ER19-28 intersected 34.0 m of 0.465 g/t Pd, 0.281 g/t Pt, 0.201 g/t Au with 0.3% Cu from 97.0 m to 131.0 m. includes four 2 m long intervals with over 0.7 g/t Pd. Drill Hole ER19-29 intersected 56.0 m of 0.488 g/t Pd, 0.272 g/t Pt, 0.188 g/t Au with 0.42% Cu from 46.0 m to 102.0 m. includes six 2 m long intervals with over 0.7 g/t Pd. Drill Hole ER19-30 intersected 8.0 m of 0.511 g/t Pd, 0.306 g/t Pt, 236 g/t Au with 0.42% Cu from 91.0 m to 99.0 m. includes one 2 m long intervals with over 0.8 g/t Pd. 9 new drill holes of which 7 new drill holes had intersections equal to or greater than 0.3 g/t Pd. Total new drilling equal to 1,442 m averaging 160 m per drill hole. The palladium to platinum ratio for most of the intervals range from 1.6:1 to 1.9:1 CALGARY, Alberta, May 28, 2019 (GLOBE NEWSWIRE) -- Champion Bear Resources Ltd. (TSXV: CBA-V) (\"Champion Bear\" or the \"Company\") is pleased to announce results from the Q1 2019 Eagle Rock drilling program on its 100% owned project located 60km south of Dryden in NW Ontario. The results for the 9 NQ diamond drill holes in the Campbell Zone on the Eagle Rock Project are summarized in Table 1 below. The drilling program was designed to collect data predominantly within the top 150 meters of the surface in order to fill historical data gap near surface and complement existing data from 99 drill holes that range as deep as 426m in order to better understand the mineralization distribution. The 9 holes completed in 2019 are located between existing drill sections of the Campbell Zone and as such do not constitute a material change on the Project. Table 2 provides details of collar location and hole orientation. A plan view map is attached identifying the Q1 2019 drilling program (Figure 1). Table 1 – Eagle Rock Copper-PGE Project – Significant Intercepts from 10 Diamond Drill Holes Hole ID From (m) To (m) Length(m) Ni (%) Cu (%) Pt (g/t) Pd (g/t) Au (g/t) Co (%) ER19-23 86.31 87.15 0.84 0.05 0.30 0.245 0.429 0.178 0.000 ER19-24 101.00 108.50 7.50 0.05 0.40 0.323 0.548 0.250...