Business

CORRECTION FROM SOURCE: Chakana Copper Intersects 120.4m of 0.51 g/t Au, 0.83% Cu, and 34.6 g/t Ag (1.46% Cu-Eq; 2.23 g/t Au-Eq) from 101.3m at Huancarama, Soledad Project, Peru

Vancouver, British Columbia--(Newsfile Corp. - January 25, 2021) - Chakana Copper Corp. (TSX...

articleChakana Copper Corp.January 25, 20215/company/chakana-copper-corp/news/correction-from-source-chakana-copper-intersects-1204m-of-051-gt-au-083percent-cu-and-346-gt-ag-146percent-cu-eq-223-gt-au-eq-from-1013m-at-huancarama-soledad-project-peru
CORRECTION FROM SOURCE: Chakana Copper Intersects 120.4m of 0.51 g/t Au, 0.83% Cu, and 34.6 g/t Ag (1.46% Cu-Eq; 2.23 g/t Au-Eq) from 101.3m at Huancarama, Soledad Project, Peru

About this update from Chakana Copper Corp.

[{"type":"text","content":"CORRECTION FROM SOURCE: Chakana Copper Intersects 120.4m of 0.51 g/t Au, 0.83% Cu, and 34.6 g/t Ag (1.46% Cu-Eq; 2.23 g/t Au-Eq) from 101.3m at Huancarama, Soledad Project, PeruVancouver, British Columbia--(Newsfile Corp. - January 25, 2021) - Chakana Copper Corp. (TSXV: PERU) (OTCQB: CHKKF) (FSE: 1ZX) (the \"Company\" or \"Chakana\"), further to the news release regarding drill results at Huancarama, Soledad Project, Peru that was released today, the Company is revising its headline and the table contained within the news release to correct the Au-Eq equivalent from 3.71 to 2.23 g/t Au-Eq. All other values contained within are correct.Vancouver, British Columbia--(Newsfile Corp. - January 25, 2021) - Chakana Copper Corp. (TSXV: PERU) (OTCQB: CHKKF) (FSE: 1ZX) (the \"Company\" or \"Chakana\"), is pleased to release results for two additional drill holes from the recently-announced discovery at the Huancarama Breccia Complex, within the Soledad Project in Ancash, Peru (Fig. 1). The holes complement the initial eight holes that were published on January 12, 2021. Drilling at Huancarama is ongoing where eighteen HQ diamond core holes have been completed thus far.Mineralized intervals from two additional holes at Huancarama include: DDH #From - To (m)Core Length (m)Aug/tAgg/tCu %Cu-eq%*Au-eq g/t*SDH20-16186.00193.00107.000.2833.70.420.891.36including126.00162.0036.000.3459.80.931.662.54SDH20-162101.30221.70120.400.5134.60.831.462.23including101.30173.5072.200.7946.91.322.243.42including109.00139.0030.001.4488.22.554.266.50 * Cu_eq and Au_eq values were calculated using copper, gold, and silver. Metal prices utilized for the calculations are Cu - US$2.90/lb, Au - US$1,300/oz, and Ag - US$17/oz. No adjustments were made for recovery as the project is an early stage exploration project and metallurgical data to allow for estimation of recoveries are not yet available. The formulas utilized to calculate equivalent values are Cu_eq (%) = Cu% + (Au g/t * 0.6556) + (Ag g/t * 0.00857) and Au_eq (g/t) = Au g/t + (Cu% * 1.5296) + (Ag g/t * 0.01307).Holes SDH20-161 and SDH20-162 were drilled to the northeast from the south side of the breccia complex (Figures 2 and 3). Both holes intersected continuous mineralization across the breccia body previously defined by the first eight holes and an historical tunnel that transects the breccia. Ho...

More updates from Chakana Copper Corp.