Business
Chakana Reports 113m of 0.90 g/t Gold, 0.92% Copper and 72.8 g/t Silver (2.13% Cu-Eq) in Huancarama at Soledad, Peru
Soledad Project Highlights Include: 12 new resource definition holes at Huancarama report...

About this update from Chakana Copper Corp.
[{"type":"text","content":"Chakana Reports 113m of 0.90 g/t Gold, 0.92% Copper and 72.8 g/t Silver (2.13% Cu-Eq) in Huancarama at Soledad, PeruSoledad Project Highlights Include:12 new resource definition holes at Huancarama reported, totalling 2,974.85mAdditional resource definition drill results pending for Breccia Pipe 5 \"(Bx 5)\" and HuancaramaGradient-array induced-polarization (IP) geophysical survey completed over entire mineral system Off-set IP surveys underway over high priority targets defined by gradient array and other data setsVancouver, British Columbia--(Newsfile Corp. - November 1, 2021) - Chakana Copper Corp. (TSXV: PERU) (OTCQB: CHKKF) (FSE: 1ZX) (the \"Company\" or \"Chakana\"), is pleased to provide results from twelve resource definition holes drilled in Huancarama totaling 2,974.85m at the Soledad project, Ancash, Peru (see table below). The resource drilling is part of a fully funded 26,000m exploration and resource drilling program planned for 2021 (Fig. 1). These results compliment previous results from Huancarama and will increase confidence in the initial resource estimate covering six breccia pipes, which is anticipated to be completed by the end of 2021.\"Results for the resource definition drilling at Huancarama have been outstanding thus far. This is a large breccia pipe that is part of a much larger breccia complex. The resource drilling has focused on the east side of the breccia complex where two breccia pipes coalesce into one larger pipe with excellent grades for copper, gold, and silver. We have additional resource definition drill results to release for Bx 5 and Huancarama as we close in on the first resource ever for this new discovery,\" stated President and CEO David Kelley. Drill Results Huancarama (Resource Definition)DDH #From - To (m)Core Length (m)Aug/tAgg/tCu %Cu-eq%*Au-eq g/t*SDH21-22889.75141.0051.250.2534.40.270.731.11and170.00222.0052.000.4050.61.141.832.81SDH21-23090.0093.253.251.53285.25.759.1914.06and125.00200.0075.000.5644.30.341.081.66and219.00221.002.002.94132.61.074.136.31SDH21-232114.20242.00127.800.5565.10.481.402.14SDH21-237123.00236.00113.000.9072.80.922.133.26SDH21-242146.00210.0064.000.5041.30.631.312.00SDH21-245152.00217.0065.000.3140.70.701.251.91SDH21-246153.00218.0065.000.2927.40.581.001.54SDH21-247170.35199.0028.650.4568.30.861.742.66and283.00323.1540.150.2230.00.671.071.64SDH21-248146...