Business
Repeat Customer RIU Hotels & Resorts Installs New Capstone Microturbine System at Chicago Flagship Property to Cut Utility Costs and Lower Emissions
Repeat Customer RIU Hotels & Resorts Installs New Capstone Microturbine System at Chicago Flagship Property to Cut Utility Costs and Lower Emissions.

About this update from Capstone Green Energy Holdings Inc.
[{"type":"text","content":"\r\n\r\n \r\n \r\n Repeat Customer RIU Hotels & Resorts Installs New Capstone Microturbine System at Chicago Flagship Property to Cut Utility Costs and Lower Emissions\r\n \r\n \r\n\r\n\r\nRepeat Customer RIU Hotels & Resorts Installs New Capstone Microturbine System at Chicago Flagship Property to Cut Utility Costs and Lower Emissions\r\n\r\n\r\n\r\n\r\n\r\n\r\nHotel RIU Plaza Chicago Installation Marks RIU’s Fourth Capstone Project\r\n\r\n\r\n LOS ANGELES--(BUSINESS WIRE)--\r\nCapstone Green Energy Holdings, Inc. (the \"Company” or “Capstone”) (OTCID: CGEH) and Capstone Green Energy, LLC announced that Vergent, Capstone’s exclusive distributor for the Midwest and Northeast United States, will hold a ribbon cutting ceremony with RIU Hotels & Resorts for a high-efficiency Combined Heat and Power (CHP) microturbine system installation at Hotel RIU Plaza Chicago. The system was ordered in December of 2024 and delivered in March 2025.\r\n\r\n\r\n This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20250820473504/en/\r\n https://mms.businesswire.com/media/20250820473504/en/2557940/4/Riu_Hotel_Chicago_19Au25.jpgThe Hotel Riu Plaza in Chicago marks RIU’s fourth Capstone Project and features three C65 ICHP microturbines in a combined heat and power (CHP) application. The new system highlights RIU’s ongoing commitment to sustainability, operational cost savings, and energy resilience across its North American properties.\r\n \r\n \r\nThis marks RIU’s fourth Capstone-powered hotel, with three previous projects, two in New York and one in Toronto. The new system, installed in July 2025, highlights RIU’s ongoing commitment to sustainability, operational cost savings, and energy resilience across its North American properties.\r\n\r\n\r\n \r\nProject Details:\r\n\r\n\r\n \r\n \r\nThree Capstone C65 ICHP microturbines\r\n\r\n\r\n \r\nThree gas compressors\r\n\r\n\r\n \r\nVergent Energy Plant Controller with remote monitoring\r\n\r\n\r\n \r\nOn-site electricity and hot water generation\r\n\r\n\r\n \r\nFactory Protection Plan (FPP) contract\r\n\r\n\r\n \r\n \r\nThe Hotel RIU Plaza in Chicago marks RIU’s fourth Capstone Project and features three C65 ICHP microturbines in a combined heat and power (CHP) applic...