Business

Centrica and X-energy Sign Joint Development Agreement to Deploy U.K.’s First Advanced Modular Reactors and Pursue 6 Gigawatts of New Nuclear Capacity in the U.K.

LONDON, September 14, 2025--Centrica and X-energy announce entry into a Joint Development Agreement to deploy X-energy’s Xe-100 Advanced Modular Reactors in the United Kingdom.

articleCentrica PlcSeptember 14, 20257/company/centrica-plc/news/centrica-and-x-energy-sign-joint-development-agreement-to-deploy-uks-first-advanced-modular-reactors-and-pursue-6-gigawatts-of-new-nuclear-capacity-in-the-uk
Centrica and X-energy Sign Joint Development Agreement to Deploy U.K.’s First Advanced Modular Reactors and Pursue 6 Gigawatts of New Nuclear Capacity in the U.K.

About this update from Centrica Plc

[{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":800,"height":232,"url":"https://media.zenfs.com/en/business-wire.com/2eadd4f2d2ccc88b7e206d7497c1c065"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/jJN_65GMDt7rBBRyyoRd.w--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTI3ODtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/2eadd4f2d2ccc88b7e206d7497c1c065","width":800,"height":232},"lightbox":{"url":"https://s.yimg.com/ny/api/res/1.2/iXk_rDRttEuD.jTpUmqKeQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTE2MDA7aD00NjQ7Y2Y9d2VicA--/https://media.zenfs.com/en/business-wire.com/2eadd4f2d2ccc88b7e206d7497c1c065","width":800,"height":232}},"lazy":false},{"type":"list","items":[{"val":[{"type":"text","content":"Preferred first project is expected to be at EDF and Centrica’s Hartlepool site, paving the way for a national fleet of up to 6 GW of advanced reactors with the ability to provide enough power for 14 million homes.","length":214,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"Fleet deployment target is the largest announced to date for Advanced Modular Reactors in the U.K. and could generate at least $54 billion in economic activity, creating thousands of high-quality jobs.","length":201,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"Deployed new nuclear capacity is set to make a significant contribution to the next wave of clean, secure electricity and high temperature heat for industry and manufacturing.","length":175,"tagName":"p","attribs":{}}]}],"tagName":"ul","bulletedList":true,"length":590,"olType":false},{"type":"text","content":"LONDON, September 14, 2025--(BUSINESS WIRE)--Centrica plc ("Centrica") and X-Energy, LLC ("X-energy"), a wholly-owned subsidiary of X-Energy Reactor Company, LLC, today announced their entry into a Joint Development Agreement ("JDA") to deploy X-energy’s Xe-100 Advanced Modular Reactors ("AMR") in the United Kingdom. The companies have identified EDF and Centrica’s Hartlepool site as the preferred first site for a planned U.K. fleet of up to 6 gigawatts.","length":498,"tagName":"p"},{"type":"text","content":"The agreement represents the first stage in a new trans-Atlantic alliance which could ultimately mobilize at least $54 billion in economic value to bring clea...

More updates from Centrica Plc

clean powerCentrica plcnuclear power stationX-Energy Reactor Company, LLCenergy securityHartlepoolnuclear energyUnited KingdomenergyX-Energy, LLC