Business
EnerCube Completes Complex Design Project With Altasteel
EnerCube Completes Complex Design Project With Altasteel.

About this update from Saltbae Capital Corp
[{"type":"text","content":"\n\n\n\nEnerCube Completes Complex Design Project With Altasteel\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n\n\n\n\n\n\nEnerCube Completes Complex Design Project With Altasteel\nCanada NewsWire\nTORONTO, April 1, 2019\n\n\n\nTORONTO, April 1, 2019 /CNW/ -- CellCube Energy Storage Systems Inc. (\"CellCube\" or the \"Company\") (CSE CUBE) (CSE: CUBE.CN) (OTCQB: CECBF) (Frankfurt 01X, WKN A2JMGP) on behalf of its wholly-owned subsidiary, EnerCube Switchgear Systems Inc. (\"EnerCube\") is pleased to announce EnerCube has completed a significant sale and complex switchgear upgrade to the AltaSteel plant. AltaSteel is a Canadian manufacturer of prime quality steel products for the mining, construction, automotive and engineering industries based in Edmonton, Alberta. They also supply to western Canada and export to the US and Mexico.  \nhttp://www.altasteel.com/company\n\"The project was extremely complex in its engineering scope and EnerCube did an excellent job and we were very pleased with the results,\" stated Bryan MacKenzie of AltaSteel. \"We look forward to working on additional projects with the EnerCube team.\"\nThe Project required a complete solution for replacing existing compact switchgear with new compact custom 5kV Metal Clad Switchgear. The scope commenced with design and supply, and ultimately developed into testing, field installation, and commissioning. Enercube marked this as the first project to install 5kV metal clad switchgear at a steel manufacturing plant. Beside the compactness, this system had two high breaker cell configurations with custom power source compartment for customer load. The site work included removal of existing switchgear, pulling new 5kV power cables, installing NGR for the transformer, installing and testing our switchgear. The job was done ahead of schedule and received appreciation for customer focus and quality.\n \"The EnerCube team does their best work executing turnkey solutions and we were very excited to have the opportunity to work with AltaSteel on this project,\" states Brian Ricker, ...