Business
CAT Strategic Metals: Kamativi Lithium Project Update
VANCOUVER, BC / ACCESSWIRE / October 20, 2022 / CAT Strategic Metals Corporation (CSE:CAT, OTC:CATTF, FRA:8CH) ("CAT" or the "Company") wishes to report that th

About this update from Cat Strategic Metals Corporation
[{"type":"text","content":" VANCOUVER, BC / ACCESSWIRE / October 20, 2022 / CAT Strategic Metals Corporation (CSE:CAT, OTC:CATTF, FRA:8CH) (\"CAT\" or the \"Company\") wishes to report that there have been numerous recent shareholder enquiries regarding the Company's ownership interest in the Kamativi Lithium Tailings Project (the \"Project\"), located in Northwest Zimbabwe. In 2018, through an earn-in process, CAT acquired an 18.9% interest in Zimbabwe Lithium Company (Mauritius) Limited (\"ZIM\"), which has the development rights for the Kamativi Lithium Tailings Deposit at the currently defunct Kamativi Tin Mine; the mine began production in 1936 and ceased operations in 1994 due to low tin prices and falling ore grades. ZIM, in turn, holds a 100% interest in Zimbabwe Lithium Company (PVT) Ltd (\"ZLC\") (formerly Jimbata (Pvt) Ltd). The Kamativi Tailings Project is a joint venture (\"JV\") between the Zimbabwe Mining Development Corporation (\"ZMDC\"), owners of Kamativi Tin Mines - which holds 40% of the Project, and ZLC - which holds a 60% interest. The Kamativi Tailings Project is a man-made deposit that was generated as a site for the containment of tailings produced during the processing of tin mineralization at the Kamativi Tin Mine. The tailings were deposited over a 58-year production period and are derived from the mining and processing of mineralized tin bearing lithium-caesium-tantalum pegmatites. Spodumene is the main lithium mineral present and historical estimates of the size and lithium content of the deposit - coupled with the most recent work undertaken by the Company in 2018 - indicate that there is lithium mineralization of economic interest. In the fall of 2018, the Company published a Technical Report prepared by MSA Group (Pty) Ltd that was prepared in accordance with the disclosure and reporting requirements set forth in National Instrument 43-101 Standards of Disclosure for Mineral Projects (\"NI 43-101\"), Companion Policy 43-101CP, Form 43-101F1, and the CIM Definition Standards for Mineral Resources and Mineral Reserves adopted by the CIM Council on May 10, 2014. Contained in the Technical Report was a Mineral Resource Estimate Statement as follows: Kamativi Lithium Tailings Mineral Resource for the Total Tailings Deposit: September 2018 Category Tonnes (Millions) Density t/m3 Li2O (%) SnO2 ppm Ta2O5 ppm Fe2O3 (%) Nb2O5 ppm I...