Highlights :
The resource estimate is constrained using DSO “ Deswik Stope Optimizer ” with a cut-off grade of 2.0 g/t Au for the North and South Gold Corridors and 1.5 g/t Au for the Central Gold Corridor and using a price of gold of USD 1,612 US / oz.
VAL-D'OR-Quebec, March 23, 2021 (GLOBE NEWSWIRE) -- Cartier Resources Inc. (TSX-V: ECR) (“Cartier”) announces the results of its third mineral resource estimate for the Mine Chimo property, located 45 km east of Val-d'Or. The estimate, completed and made available on the effective date of March 22, 2021, was carried out by Ms. Christine Beausoleil, P. Geo. of InnovExplo Inc., an independent qualified person within the meaning of NI 43-101.
“These significant resources of the Chimo Mine property will be accessible via the restoration of existing underground infrastructure located within trucking distance to several mills. The Val-d’Or area infrastructures and its qualified work force constitute a considerable advantage for the rapid start of this mining project. Finally, the historic metallurgical and mining experience of the project will facilitate designs,” commented Philippe Cloutier, President and CEO.
Mineralisation on the Chimo Mine Property is comprised of 27 Gold Zones hosted within 17 Gold Structures; the latter grouped within 3 Gold Corridors. The Mineral Resource Estimate to date for the property is presented in the following table (FIGURE):
| Gold Corridor Cut-off Grade (g/t Au) | Indicated Resources | Inferred Resources | ||||
| Metric Tonnes (t) | Grade (g/t Au) | Troy Ounce (oz Au) | Metric Tonnes (t) | Grade (g/t Au) | Troy Ounce (oz Au) | |
| North Gold Corridor (> 2.0) | 1,119,000 | 3.85 | 139,000 | 1,563,000 | 3.54 | 178,000 |
| Central Gold Corridor (> 1.5) | 5,053,000 | 3.03 | 493,000 | 11,728,000 | 2.55 | 963,000 |
| South Gold Corridor (> 2.0) | 444,000 | 3.61 | 52,000 | 1,949,000 | 3.47 | 217,000 |
| Total | 6,616,000 | 3.21 | 684,000 | 15,240,000 | 2.77 | 1,358,000 |
The resource estimate of the North Gold Corridor, consisting of 9 zones (1A, 1B, 2, 2B, 2W, 3, 3E, 4B and 4B2), of the Central Gold Corridor, consisting of 13 zones (5B, 5B2, 5B3, 5B4, 5C, 5CE, 5M, 5M2, 5M3, 5M4, 5N, 5NE and 6N1) as well as the South Gold Corridor, consisting of 5 zones (6, 6B, 6C, 6P and 6P2), is completed from the information known to date. However, the potential to increase the resources below and peripheral to the area of the eastern sector of the property (FIGURE) remains significant. In addition, the potential to increase resources below and peripheral to all gold zones remains open.
The volume of rock that contains the gold-bearing zones of the property known to date, for which the resources have been estimated, has a length in the east-west orientation of 1,400 m, a width in the north-south orientation of 675 m and a height of 1,600 m (FIGURE). The majority of resources are located near existing underground openings. However, Zone 6N1 is located 125 m to the southeast and the areas in the eastern sector of the property are located 450 m to the east of the existing underground infrastructure.
The industrial sorting tests of the mineralization, carried out in spring 2020 at Steinert US in Kentucky (USA) and the additional tests currently underway at COREM in Quebec, aim to:
Internal engineering studies, in progress since February 2020, are developing and producing the design of mining scenarios for the 3 gold corridors of the property with the goal of minimizing costs and maximizing the recovery of the greatest number of ounces of gold. The first internal engineering study was completed with positive conclusions.
Additional notes on the resource estimate
| Cut-off Grade | North Gold Corridor | Central Gold Corridor | South Gold Corridor | |||||||
| Metric Tonnes (t) | Grade (g/t Au) | Troy Ounces (oz Au) | Metric Tonnes (t) | Grade (g/t Au) | Troy Ounces (oz Au) | Metric Tonnes (t) | Grade (g/t Au) | Troy Ounces (oz Au) | ||
| INDICATED RESOURCES | ||||||||||
| 1.0 | 2,291,000 | 2.65 | 195,000 | 6,802,000 | 2.57 | 562,000 | 843,000 | 2.61 | 71,000 | |
| 1.5 | 1,604,000 | 3.23 | 166,000 | 5,053,000 | 3.03 | 493,000 | 630,000 | 3.04 | 62,000 | |
| 2.0 | 1,119,000 | 3.85 | 139,000 | 3,596,000 | 3.54 | 410,000 | 444,000 | 3.61 | 52,000 | |
| 2.5 | 785,000 | 4.53 | 114,000 | 2,588,000 | 4.07 | 338,000 | 293,000 | 4.25 | 40,000 | |
| 3.0 | 551,000 | 5.33 | 94,000 | 1,846,000 | 4.62 | 274,000 | 216,000 | 4.78 | 33,000 | |
| 3.5 | 410,000 | 6.03 | 79,000 | 1,318,000 | 5.22 | 221,000 | 156,000 | 5.39 | 27,000 | |
| 4.0 | 311,000 | 6.79 | 68,000 | 979,000 | 5.80 | 182,000 | 117,000 | 5.95 | 22,000 | |
| INFERRED RESOURCES | ||||||||||
| 1,0 | 3,779,000 | 2.29 | 279,000 | 18,102,000 | 2.10 | 1,220,000 | 4,830,000 | 2.24 | 348,000 | |
| 1,5 | 2,386,000 | 2.89 | 222,000 | 11,728,000 | 2.55 | 963,000 | 2,897,000 | 2.90 | 271,000 | |
| 2,0 | 1,563,000 | 3.54 | 178,000 | 7,334,000 | 3.02 | 712,000 | 1,949,000 | 3.47 | 217,000 | |
| 2,5 | 1,145,000 | 3.98 | 147,000 | 4,741,000 | 3.44 | 525,000 | 1,351,000 | 3.97 | 172,000 | |
| 3,0 | 814,000 | 4.47 | 117,000 | 2,822,000 | 3.93 | 356,000 | 903,000 | 4.57 | 133,000 | |
| 3,5 | 581,000 | 4.98 | 93,000 | 1,713,000 | 4.43 | 244,000 | 518,000 | 5.53 | 92,000 | |
| 4,0 | 432,000 | 5.41 | 75,000 | 956,000 | 5.03 | 155,000 | 335,000 | 6.53 | 70,000 | |
The above table illustrates the sensitivity of this mineral resource estimate to different cut-off grades for underground operation scenarios with reasonable prospects for economic extraction. The reader is cautioned that the figures provided in this table should not be construed as a statement of mineral resources. The quantities and estimated grades reported at different cut-off grades are presented for the sole purpose of demonstrating the sensitivity of the resource model to the choice of a specific cut-off grade per gold corridor.
InnovExplo Inc.’s report will be filled on SEDAR with-in 45 days from the present.
About Chimo Mine Project
About Cartier
Cartier Resources Inc., founded in 2006, is based in Val-d’Or, Quebec. This province has consistently ranked as one of the world’s best mining jurisdictions, primarily because of its favourable geology, attractive fiscal environment and pro-mining government.
Quality Assurance / Quality Control
The analytical results, from Cartier drill holes, were obtained from NQ-caliber core samples crushed up to 80% passing a 10 mesh (2.00 mm) mesh then pulverized up to 90% passing a mesh of 200 mesh (0.07mm). Cartier inserts 5% of the number of samples as certified standards and another 5% as sterile samples to ensure quality control. Samples are analyzed at Techni-Lab (Actlabs), located in Ste-Germaine-Boulé, Quebec. The 50 g pulps are analyzed by fire assay and read by atomic absorption. If i) the result is ≥ 1.0 g/t and <10.0 g/t, a second pulp is analyzed and read by atomic absorption and if ii) the result ≥ 10.0 g/t, the second measurement is performed by gravimetry. For samples containing visible gold, 500 g of rock pulverized up to 90% passing a 140 mesh (0.11 mm) mesh is analyzed by the " Metallic Sieve " method.
Qualified Persons
The scientific and technical information on the Company and the Chimo Mine Project in this news release was prepared and reviewed by Mr. Gaétan Lavallière, P. Geo., Ph. D, Cartier’s Vice- President, and Mr. Ronan Déroff, P. Geo, M. Sc., Cartier’s Senior Geologist, Project Manager and Geomatician, both qualified persons as defined in NI 43-101. Mr. Lavallière approved the information contained in this press release.
The qualified persons independent of the issuer within the meaning of NI 43-101, responsible for estimating the mineral resources of the Chimo Mine Property, is Ms. Christine Beausoleil, P. Geo., of InnovExplo Inc. Ms. Beausoleil declares that she read this press release and that the scientific and technical information relating to the resource estimate presented therein is consistent.
About InnovExplo Inc.
InnovExplo Inc. is a consulting firm providing services in mineral exploration, mining geology, mineral resources, mining engineering, the environment, and sustainable development. Since its founding in 2003, InnovExplo Inc. has worked on 450 different mandates for 170 junior mineral exploration companies and producers. The firm has produced more than 300 geological or engineering reports for projects covering almost all areas of a mining project, from exploration to operations, mainly including the drafting of NI 43-101 technical reports.
For more information, contact:
Philippe Cloutier, P. Geo.
President and CEO
Telephone: 819-856-0512
philippe.cloutier@ressourcescartier.com
www.ressourcescartier.com
Neither the TSX Venture Exchange nor its regulatory services provider accepts responsibility for the adequacy or accuracy of this press release.