Business

Cantex Mine Development Corp. - New gold results for drilling at the Al Hariqah gold deposit, Yemen

Cantex Mine Development Corp. - New gold results for drilling at the Al Hariqah gold deposit, Yemen.

articleCantex Mine Development Corp.January 30, 20075/company/cantex-mine-development-corp/news/cantex-mine-development-corp-new-gold-results-for-drilling-at-the-al-hariqah-gold-deposit-yemen
Cantex Mine Development Corp. - New gold results for drilling at the Al Hariqah gold deposit, Yemen

About this update from Cantex Mine Development Corp.

[{"type":"text","content":"\n\n\n\nKELOWNA, BC, Jan. 30 /CNW/ - Cantex Mine Development Corp (CD - TSX\nVenture Exchange) (\"Cantex\" or the \"Company\").\n\n\nThe Company is pleased to report gold results for 26 drill holes at the\nAl Hariqah gold deposit, Yemen. These results are for the 16th to 41st holes\nof a 43 hole program which is now complete. The program is designed to provide\ninfill data within the previously drilled northernmost 1,100 meters of the\ndeposit as well as to provide a broad three dimensional view of the gold\nmineralization over an additional 1,240 meters. As previously reported, the Al\nHariqah gold deposit is more than 4,000 meters long.\n\n\nThe program was carried out using the Company's combined reverse\ncirculation percussion drill which drills holes up to 90mm diameter. Sampling\nand logging of the drill cuttings were carried out by Cantex's geologists on\nsite in Yemen. Sample preparation was conducted at CF Mineral Research Ltd. in\nKelowna where the samples were split, crushed, and pulverized prior to\nshipment to ALS Chemex, an ISO 9001:2000 accredited laboratory in Vancouver.\n\n\nAt ALS Chemex the gold content is determined using a fire assay with an\nAAS finish (Au-AA24). Any samples with gold contents in excess of 10 g/t are\nthen re-assayed using a fire assay with a gravimetric finish (Au-GRA22).\nSignificant results for these holes are summarized in the following table:\n\n\n-------------------------------------------------------------------------\n Drill hole Grade Intersection From To\n-------------------------------------------------------------------------\n g/t meters meters meters\n-------------------------------------------------------------------------\n YPH 04 2.09 21.0 4.5 25.5\n-------------------------------------------------------------------------\n 0.86 18.0 43.5 61.5(x)\n-------------------------------------------------------------------------\n YPH 07 2.45 1.5 18.0 19.5\n-------------------------------------------------------------------------\n 0.99 10.5 42.0 52.5\n-------------------------------------------------------------------------\n 2.13 1.5 63.0 64.5\n-------------------------------------------------------------------------\n YPH 09 1.53 36.0 6.0 42.0(x)\n-------------------------------------------------------------------------\n YPH 14 1.17 19.5 6.0 25.5\n-------------------------------...

More updates from Cantex Mine Development Corp.