Business
Orex Drills More Silver Mineralization, Including 46 Metres of 218 g/t Silver, at Canasil's Sandra-Escobar Project in Durango State, Mexico
Orex Drills More Silver Mineralization, Including 46 Metres of 218 g/t Silver, at Canasil'...

About this update from Canasil Resources Inc.
[{"type":"text","content":"\n\n\n\nOrex Drills More Silver Mineralization, Including 46 Metres of 218 g/t Silver, at Canasil's Sandra-Escobar Project in Durango State, Mexico\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen3{\nBORDER-BOTTOM:black 1pt solid; TEXT-ALIGN: RIGHT; BORDER-LEFT:black 1pt solid; PADDING-LEFT:0.50em; PADDING-RIGHT:0.50em; VERTICAL-ALIGN: BOTTOM; BORDER-TOP:black 1pt solid; BORDER-RIGHT:black 1pt solid\n}\n.prngen2{\nBORDER-BOTTOM:black 1pt solid; TEXT-ALIGN: CENTER; BORDER-LEFT:black 1pt solid; PADDING-LEFT:0.50em; PADDING-RIGHT:0.50em; VERTICAL-ALIGN: BOTTOM; BORDER-TOP:black 1pt solid; BORDER-RIGHT:black 1pt solid\n}\n.prntbls{\nBORDER-BOTTOM: black 1px solid; BORDER-LEFT: black 1px solid; BORDER-COLLAPSE: collapse; BORDER-TOP: black 1px solid; BORDER-RIGHT: black 1px solid\n}\n.prntal{\nTEXT-ALIGN: LEFT\n}\n\n\n\n\n\n\nOrex Drills More Silver Mineralization, Including 46 Metres of 218 g/t Silver, at Canasil's Sandra-Escobar Project in Durango State, Mexico\nCanada NewsWire\nVANCOUVER, May 24, 2016\n\n\n\nTSX-V: CLZ www.canasil.com \n\n\n\nVANCOUVER, May 24, 2016 /CNW/ - Canasil Resources Inc. (TSX-V: CLZ, DB Frankfurt: 3CC, \"Canasil\" or the \"Company\") is pleased to announce that Orex Minerals Inc. (TSX-V: REX, \"Orex\") has reported that the Phase-2 core drilling program continues to intersect silver mineralization in the southeastern region of the Sandra-Escobar project. Results from eight additional drill holes, SA-16-023 to SA-16-030, are reported in the table below. The project is being advanced by Orex under an option agreement with Canasil announced on September 15, 2015. Eight further drill holes, SA-16-031 to SA-16-038 have also been completed in the Phase-2 program and results will be reported as they are received and analyzed.  \n\nA highlight for this batch of Phase-2 drill holes is SA-16-023, which returned 46 metres core length (40.5 metres true thickness) grading 218 g/t silver, starting 25 metres vertically below surface. Within this is a sub-interval of 4.0 metres (3.5 metres true thickness) grading 820 g/t silver. Five of the eight holes, SA-16...