Business
Canamex Drilling Intersects 44.2 Metres Grading 6.97 g/tonne Au and 47.3 Metres Grading 3.4 g/tonne Au at Bruner Gold Project, Nevada
(via Thenewswire.ca) Vancouver, BC / TNW-ACCESSWIRE / July 7, 2014 / Canamex Resources...

About this update from Canamex Gold Corp
[{"type":"text","content":"Canamex Drilling Intersects 44.2 Metres Grading 6.97 g/tonne Au and 47.3 Metres Grading 3.4 g/tonne Au at Bruner Gold Project, Nevada(via Thenewswire.ca)\n \n \nVancouver, BC / TNW-ACCESSWIRE / July 7, 2014 / Canamex Resources Corp. (the \"Company\") (TSX-V: CSQ) (OTCQX: CNMXF) (FSE: CX6) is very pleased to announce ongoing results from reverse circulation drilling at the Bruner Gold Project located in Nye County, Nevada. \n\n\n \nRC Hole B-1425\n\n\n \nReverse circulation drill hole B-1425, drilled into the East Zone at the historic resource area* intersected 145 feet (44.2 metres) grading 0.203 oz/ton Au (6.97 g/tonne Au ) from 40-185 feet (12.2-56.4 metres) depth. Within this zone is a high-grade interval from 60-85 feet (18.3-25.9 metres) that grades 0.81 oz/ton (27.91 g/tonne) Au and 9.55 oz/ton (327.3 g/tonne) Ag. This intercept offsets to the south mineralized intervals drilled in holes B-1408C and historic drill hole BRU-094, which indicated the presence of a zone of gold mineralization that was above the average grade of the historic resource. Drill hole B-1425, along with the other holes reported below that were also drilled into the East Zone of the historic resource area* confirm there is a higher grade zone that needs to be properly quantified with sufficient drilling to include in a NI 43-101 resource estimate. A plan view map will be posted to the web site that displays the location of all holes drilled to date at the historic resource area, along with a cross section displaying the drill holes described in this release. \n\n\n \nMineralized intercepts in hole B-1425 are reported in the table below:\n\n \n\nHole ID \n\n\n\n\nFrom-To(ft)\n\n\n\n\nThickness (ft/m) \n\n\n\n\noz/ton Au\n\n\n\n\ng/tonne Au\n\n\n\n\nEst. True Width\n\n\n\n\nB-1425 \n\n\n\n\n40-185 \n\n\n\n\n145/44.2\n\n\n\n\n0.203\n\n\n\n\n6.97\n\n\n\n\n90/27.4\n\n\n \n\n\n205-310\n\n\n\n\n105/32.0\n\n\n\n\n0.018\n\n\n\n\n0.52\n\n\n\n\n50/15.2\n\n\n \n\n\n340-360\n\n\n\n\n20/6.1\n\n\n\n\n0.043 \n\n\n\n\n1.49\n\n\n\n\n10/3.0\n\n\n \n\n\n420-445\n\n\n\n\n25/7.6\n\n\n\n\n0.011\n\n\n\n\n0.37\n\n\n\n\n12.5/3.8\n\n\n \n \nRC Hole B-1424\n\n\n \nReverse circulation drill hole B-1424 was drilled to offset to the north the mineralized intervals drilled in holes B-1408C and historic drill hole BRU-094 of the East Mineralized Zone referenced above. Hole B-1424 int...