Business
Canamex Drilling Intersects 25.9 Metres Grading 2.37 g/tonne Au in the Penelas East Zone at Bruner Gold Project, Nevada
(via Thenewswire.ca) Vancouver, BC / TNW-ACCESSWIRE / October 7, 2014 / Canamex Reso...

About this update from Canamex Gold Corp
[{"type":"text","content":"Canamex Drilling Intersects 25.9 Metres Grading 2.37 g/tonne Au in the Penelas East Zone at Bruner Gold Project, Nevada(via Thenewswire.ca)\n \n \nVancouver, BC / TNW-ACCESSWIRE / October 7, 2014 / Canamex Resources Corp. (the \"Company\") (TSX-V: CSQ) (OTCQX: CNMXF) (FSE: CX6) is pleased to announce ongoing results from reverse circulation drilling at the Bruner Gold Project located in Nye County, Nevada. \n\n\n \nRC Hole B-1437\n\n\n \nReverse circulation drill hole B-1437, drilled at the northern extension of the Penelas East Zone, intersected 25.9 metres (85 feet) grading 2.37 g/tonne Au (0.069 oz/ton Au) at the top of the hole from 6.1-32.0 metres (20-105 feet) depth. This zone starts at the bottom of the 20 foot casing and may extend to the surface, as the material drilled during the setting of the casing was not sampled. This interval is part of a much thicker intercept that extended from 6.1-62.5 meters (20-205 feet) grading 1.33 g/tonne (0.039 opt) Au. In addition, several other zones were intersected in the hole as referenced in the table below. These intercepts are at the far northern end of drilling at the Penelas East discovery area, and the closest drill hole to the north is over 100 meters away. As a result the Penelas East discovery area remains wide open to the north for expansion with additional drilling.\n\n\n \nRC Hole B-1437\n\n \n\nFrom (ft.)\n\n\n\n\nto (ft.)\n\n\n\n\nThick.(ft.)\n\n\n\n\nAu gpt\n\n\n\n\nAu opt\n\n\n\n\n20\n\n\n\n\n205\n\n\n\n\n185\n\n\n\n\n1.33\n\n\n\n\n0.039\n\n\n\n\nincluding\n\n\n \n \n \n \n\n\n20\n\n\n\n\n105\n\n\n\n\n85\n\n\n\n\n2.37\n\n\n\n\n0.069\n\n\n\n\n255\n\n\n\n\n300\n\n\n\n\n45\n\n\n\n\n0.77\n\n\n\n\n0.022\n\n\n\n\n555\n\n\n\n\n590\n\n\n\n\n35\n\n\n\n\n0.44\n\n\n\n\n0.013\n\n\n\n\n690\n\n\n\n\n735\n\n\n\n\n45\n\n\n\n\n1.25\n\n\n\n\n0.036\n\n\n \n \n \n \n \n\n \nTrue widths of the above reported intercepts are currently unknown.\n\n\n \nHole B-1437 was drilled the day after hole B-1436 was completed, and long before assays were received from hole B-1436. As a result geologists were not aware of the high grade at the bottom of hole B-1436 from 750-780 feet (TD), and hole B-1437 was terminated before reaching the projection of the high-grade zone encountered in hole B-1436.\n\n\n \nTo follow up on the high-grade intercept in RC hole B-1436 a core rig was positioned at the coll...