Business
Canamex Drilling Intersects 22.9 Metres Grading 3.29 g/tonne Au in the Penelas East Zone at Bruner Gold Project, Nevada
(via Thenewswire.ca) Vancouver, BC / TN-ACCESSWIRE / October 21, 2014 / Canamex Reso...

About this update from Canamex Gold Corp
[{"type":"text","content":"Canamex Drilling Intersects 22.9 Metres Grading 3.29 g/tonne Au in the Penelas East Zone at Bruner Gold Project, Nevada(via Thenewswire.ca)\n \n \nVancouver, BC / TN-ACCESSWIRE / October 21, 2014 / Canamex Resources Corp. (the \"Company\") (TSX-V: CSQ) (OTCQX: CNMXF) (FSE: CX6) is pleased to announce ongoing results from core drilling at the Bruner Gold Project located in Nye County, Nevada. \n\n\n \nCore Hole B-1446C\n\n\n \nCore drill hole B-1446C, was drilled at the open northern extension of the Penelas East Zone and intersected 22.9 metres (75 feet) grading 3.29 g/tonne Au (0.096 oz/ton Au) from 221.6-244.5 metres (727-802 feet) depth. This zone incorporates a 5.0 foot (1.52 metres) wide, high-grade interval at 237.8-239.3 metres (780-785 feet) grading 37.5 g/tonne (1.094 opt) Au. In addition, several other zones were intersected higher in the hole as referenced in the table below. These intercepts are at the far northern end of drilling at the Penelas East discovery area, and the nearest neighbor drill hole to the north is over 100 meters away. As a result the Penelas East discovery area remains wide open to the north to expansion. \n\n\n \nCore Hole B-1446C\n\n \n\nInterval (ft)\n\n\n\n\nLength (ft/m)\n\n\n\n\nAu gpt\n\n\n\n\nAu opt\n\n\n\n\nEst. True Width (ft/m)\n\n\n \n \n \n \n \n\n\n27-42\n\n\n\n\n15/4.6\n\n\n\n\n0.551\n\n\n\n\n0.016\n\n\n\n\n7.5/2.3\n\n\n\n\n117-202\n\n\n\n\n85/25.9\n\n\n\n\n1.152\n\n\n\n\n0.034\n\n\n\n\n42.5/13\n\n\n\n\n727-802\n\n\n\n\n75/22.9\n\n\n\n\n3.291\n\n\n\n\n0.096\n\n\n\n\n37.5/11.5\n\n\n\n\nincl. 780-785\n\n\n\n\n5/1.5\n\n\n\n\n37.5\n\n\n\n\n1.094\n\n\n\n\n2.5/0.75\n\n\n\n \n\nCore hole B-1446C intersected the deeper mineralized zone containing the high grade zone 32-35 feet (roughly 10 metres) along strike from the high-grade intercept encountered in RC hole B-1436 (reported earlier).\n\n\n \nA second core hole (B-1454C) was drilled into the high-grade target area, and intersected the high-grade target area 23-30 metres (75-100 feet) north of the high-grade intercept in holes B-1446C and B-1436. Results from core hole B-1446C should be available in early-October.\n\n\n \nThe high grade zone intersected in hole B-1446C remains open to the west and north, as does the thick lower grade mineralization encountered higher in the hole. \n\n\n \nDrill hole samples are stored on site and are ret...