Business
California Gold Intersects 3.0 m of 8.45 g/t, 1.1 m of 18.58 g/t, and 10.5 M of 2.31 g/t Au at its Fremont Gold Project**
California Gold Intersects 3.0 m of 8.45 g/t, 1.1 m of 18.58 g/t, and 10.5 M of 2.31 g/t ...

About this update from Canadian Goldfields Discovery Corp
[{"type":"text","content":"California Gold Intersects 3.0 m of 8.45 g/t, 1.1 m of 18.58 g/t, and 10.5 M of 2.31 g/t Au at its Fremont Gold Project**\n\t\t\tbody { font-size: 11pt;\n\t\t\t}\n\n\t\t\t.nr-sub-head ul,\n\t\t\t.nr-body ul {\n\t\t\t\tlist-style-type: disc !important;\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-sub-head ol,\n\t\t\t.nr-body ol {\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-body p, .nr-body {margin-bottom: 0px !important;\n\t\t\t\t\tmargin-top: 0px !important;\n\t\t\t\t\t-webkit-margin-before: 0px !important;\n\t\t\t\t\t-webkit-margin-after: 0px !important;\n\t\t\t\t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 11pt !important;\n\t\t\t }\n\n\t\t\ttbody {\n\t\t\t\tborder-top: 0;\n\t\t\t}\n\n\t\t\t H1 {font-weight: bold;\n\t\t\t\tfont-size: 16pt;\n\t\t\t }\n\n\t\t\t H2 {font-weight: bold;\n\t\t\t\tfont-size: 12pt;\n\t\t\t }\n\n\t\t\t H3 {font-weight: bold;\n\t\t\t\tfont-size: 11pt;\n\t\t\t }\n\n\n\t\t\t H1.nr-head {\n\t\t\t \t\tfont-family: Trebuchet MS !important;\n\t\t\t \t\tfont-size: 16pt !important;\n\t\t\t \t\tcolor: #3D86C6 !important;\n\t\t\t \t\tfont-weight:bold !important;\n\t\t\t \t\ttext-align:center !important;\n\n\t\t\t }\n\n\t\t\t H2.nr-sub-head {font-weight: bold !important;\n\t\t\t \t\tdisplay: block !important;\n\t\t\t \t\ttext-align: start !important;\n\t\t\t \t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 12pt !important;\n\t\t\t }\n\n\t\t\t .nr-body a { font-size: 11pt !important;\n\t\t\t }\n\n\t\t\t TABLE { width: auto!important;\n\t\t\t }\n\n\t\t California Gold Intersects 3.0 m of 8.45 g/t, 1.1 m of 18.58 g/t, and 10.5 M of 2.31 g/t Au at its Fremont Gold Project**\n Toronto, Ontario (FSCwire) - California Gold Mining Inc. (“California Gold” or the “Company”) announces new assay results from the Company’s recently completed Phase III drill program at its flagship Fremont Project (the “Project”) in Mariposa County, California. The drill campaign concluded on March 5, 2016. A total of 43 diamond holes, and 41,171 feet (12,549 metres) of drilling were completed during the Phase III program.\n\n \n\nVishal Gupta, California Gold’s President and CEO, said, “We continue to be pleased with the results of our first major drill program at the Project. The results continue to meet and exceed our expectat...