Business

CORRECTION FROM SOURCE: Braveheart Intersects 2.60% Copper, 33.5 g/t Gold and 18.9 g/t Silver Over 2.5 Metres at Bull River Mine

(Drill Results Demonstrate Potential for Increased Mine Life) Calgary, Alberta--(Newsfile Cor...

articleCanadian Critical Minerals IncSeptember 30, 20213/company/canadian-critical-minerals-inc/news/correction-from-source-braveheart-intersects-260percent-copper-335-gt-gold-and-189-gt-silver-over-25-metres-at-bull-river-mine
CORRECTION FROM SOURCE: Braveheart Intersects 2.60% Copper, 33.5 g/t Gold and 18.9 g/t Silver Over 2.5 Metres at Bull River Mine

About this update from Canadian Critical Minerals Inc

[{"type":"text","content":"CORRECTION FROM SOURCE: Braveheart Intersects 2.60% Copper, 33.5 g/t Gold and 18.9 g/t Silver Over 2.5 Metres at Bull River Mine(Drill Results Demonstrate Potential for Increased Mine Life)Calgary, Alberta--(Newsfile Corp. - September 30, 2021) - Braveheart Resources Inc. (TSXV: BHT) (OTCQB: RIINF) (FSE: 2ZR) (\"Braveheart\" or the \"Company\") is pleased to report high grade copper and gold mineralization on the final two diamond drill holes from the H1 2021 diamond drill program. Ian Berzins, President and CEO commented \"We are extremely pleased with the recent results from this year's drill program. The results indicate that we have mineralized material up to 175 metres below the lowest levels of the developed underground mine infrastructure and gold mineralization has increased at depth. This could result in an increase in the total Resources at the Bull River mine and potentially increase life of mine.\"Results from New Holes BRU-21-05 and BRU-21-06BRU-21-05 intersected 1.71% copper, 17.6 g/t gold and 11.6 g/t silver over 4.9 metres including 2.60% copper, 33.5 g/t gold and 18.9 g/t silver over 2.5 metres including 3.09% copper, 127 g/t gold (4.08 oz/t) and 40.60 g/t silver over 0.5 metres.BRU-21-06 intersected 2.1% copper, 0.30 g/t gold and 30.0 g/t silver over 5.9 metres including 11.41% copper, 0.94 g/t gold and 51.65 g/t silver over 1.0 metre.All six holes that have been drilled as part of the H1 2021 drilling program have intersected mineralized structures between 425 metres and 525 metres below the surface portal and between 75 metres and 175 metres below the lowest workings of the mine on 9 level. The intersections do not represent true width of the vein structures.Summary of 2021 Bull River Mine Drilling ProgramHole IDAzimuthDipFromToLengthCuAgAu(m)(m)(m)(%)(g/t)(g/t)BRU 21-0155-26171.4174.83.45.1228.60.63Including173.8174.40.619.7998.60.17BRU 21-0255-37184.1186.12.01.528.10.17BRU 21-0355-48190.9194.43.52.3912.50.29Including192.5193.51.05.6029.30.49BRU 21-0455-59205.5208.02.50.341.90.05BRU 21-0510-15104.8109.7 4.91.7111.6 17.6Including107.2109.72.5 2.60 18.9 33.52Including 109.2109.70.53.0920.3127.0BRU 21-06 10-35 103.7109.6 5.9 2.109.50.30Including105.2106.31.011.4151.70.94 The purpose of the H1 2021 drilling program was to test the down dip extension of the vein systems under the current workings to demonstr...

More updates from Canadian Critical Minerals Inc