Business
Canada One Submits Permit to Drill at 100% Owned Copper Dome Project, Princeton, British Columbia
(TheNewswire) Vancouver, BC - TheNewswire - June 15, 2023 -...

About this update from Canada One Mining Corp
[{"type":"text","content":"Canada One Submits Permit to Drill at 100% Owned Copper Dome Project, Princeton, British Columbia\n \n \n (TheNewswire)\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n Vancouver, BC -\n \n \n TheNewswire -\n \n \n June 15, 2023 -\n \n \n Canada One Mining Corp.\n \n \n (“\n \n \n Canada\nOne\n \n \n ” or the “\n \n \n Company\n \n \n ”)\n \n \n (TSXV:CONE)\n \n \n is pleased to\n \n \n \n \n announce a\n \n \n planned initial diamond\ndrill program of up to 2,500 metres once drill permitting is approved\nat its 100% owned Copper Dome Project\n \n \n (the\n“\n \n \n Project\n \n \n ”, “\n \n \n Property\n \n \n ” or “\n \n \n Copper Dome\n \n \n ”).\n \n \n \n \n Project Overview\n \n \n \n \n The Property located 18 km south of Princeton, British\nColumbia is contiguous to\n \n \n Copper Mountain Mining\nCorporation’s (TSXV: CMMC) currently producing Copper Mountain Mine,\nwhich hosts a Proven and Probable Mineral Reserve of 702 Mt of 0.24%\nCu\n \n \n (cumtn.com)\n \n \n . Copper\nDome’s northern boundary lies 1.5km from the mine’s deposits.\n \n \n \n \n The Company is currently compiling past exploration\ndata and has initiated fieldwork in anticipation of a potential fall\ndrill program.\n \n \n \n \n Drill Permitting Details\n \n \n \n \n A comprehensive drill permit has been submitted to the\nBC Ministry of Energy, Mines and Low Carbon Innovation (the\n“\n \n \n Ministry\n \n \n ”), which includes allowance for geochemical and\ngeophysical surveys in addition to diamond drilling.\n \n \n \n \n Permitting has become an important part of exploration\nplanning particularly in regard to environment, social and governance\n(ESG) efforts which require time and consultation with numerous\ngroups, primarily First Nations. C\n \n \n onsultation\nwith First nations have now been initiated. The Company anticipates a\nfirst review of the drill permit application by the Ministry to be\ncompleted by September of this year with the potential of a granted\npermit in time for a fall drilling program.\n \n \n \n \n Drill Target Details\n \n \n \n \n The Property shares similar geology, and a similar\ngeophysical and geochemical footprint to the Copper Mountain Mine.\nDrilling will focus on ...