Business
Camino Reports Diamond Drill Results from Los Chapitos Project
Camino Reports Diamond Drill Results from Los Chapitos Project Canada NewsWire V...

About this update from Camino Minerals Corporation
[{"type":"text","content":"\n\n\n\nCamino Reports Diamond Drill Results from Los Chapitos Project\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen4{\nBORDER-BOTTOM:black 0pt; TEXT-ALIGN: RIGHT; BORDER-LEFT:black 0pt; PADDING-LEFT:0.50em; PADDING-RIGHT:0.50em; VERTICAL-ALIGN: TOP; BORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt\n}\n.prngen5{\nBORDER-BOTTOM:black 0pt; BORDER-LEFT:black 0pt; PADDING-LEFT:0.50em; PADDING-RIGHT:0.50em; VERTICAL-ALIGN: TOP; BORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt\n}\n.prngen3{\nBORDER-BOTTOM:black 1pt solid; TEXT-ALIGN: CENTER; BORDER-LEFT:black 1pt solid; PADDING-LEFT:0.50em; PADDING-RIGHT:0.50em; BORDER-TOP:black 1pt solid; BORDER-RIGHT:black 1pt solid\n}\n.prnsbt0{\nBORDER-TOP:0pt\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE\n}\n.prnsbl0{\nBORDER-LEFT:0pt\n}\n.prntbls{\nBORDER-BOTTOM: black 1px solid; BORDER-LEFT: black 1px solid; BORDER-COLLAPSE: collapse; BORDER-TOP: black 1px solid; BORDER-RIGHT: black 1px solid\n}\n.prnsbb0{\nBORDER-BOTTOM:0pt\n}\n.prnsbr0{\nBORDER-RIGHT:0pt\n}\n\n\n\n\n\n\n\nCanada NewsWire\nVANCOUVER, June 7, 2017\n\n\n\nTSX Venture Symbol: COR\n\n\n\nVANCOUVER, June 7, 2017 /CNW/ - Camino Minerals Corporation (\"Camino\" or the \"Company\") (COR: TSX-V) is pleased to report results for the first diamond drill hole completed at its Los Chapitos Project (\"Chapitos\"), located in southern Peru.  Hole DCH-001 was designed to twin CHR-002 on the Adriana Zone which intersected 106 meters averaging 1.30% copper.  \n\nSelected drill highlights from hole DCH-001 include:\n\n\n0.73% copper over 55.0 meters, including 1.21% copper over 28.3 meters;\n0.72% copper over 168.5 meters, including 1.63% copper over 27.0 meters, and;\n0.94% copper over 3.8 meters at the end of the hole.\n\nHole DCH-001 intersected numerous intervals of oxide and sulphide mineralization which had a combined total length of 316 meters averaging 0.63% copper.  Diamond drilling appears to have recovered the oxide mineralization better than RC drilling, as noted by the interval from 5.7 to 61 meters.  Copper oxide mineralization was found throughout the hole, including i...