Business
Camino Identifies Diana Zone as New Satellite Drilling Target at the Los Chapitos Project, Peru; Surface Channel Samples of 1.05% Copper over 56 meters
VANCOUVER, BC / ACCESSWIRE / February 8, 2023 / Camino Corp. (TSXV:COR)(OTC PINK:CAMZF) (WKN: ...

About this update from Camino Minerals Corporation
[{"type":"text","content":"Camino Identifies Diana Zone as New Satellite Drilling Target at the Los Chapitos Project, Peru; Surface Channel Samples of 1.05% Copper over 56 metersVANCOUVER, BC / ACCESSWIRE / February 8, 2023 / Camino Corp. (TSXV:COR)(OTC PINK:CAMZF) (WKN: A116E1) (\"Camino\" or the \"Company\") is pleased to announce that its field work and geological modeling has identified the Diana Zone as a new drilling target at the Los Chapitos copper project (\"Los Chapitos\" or \"the Project\") in Peru. Previous channel sampling over the Diana Zone yielded 1.05% total copper and 14 ppm silver over 56m. The Diana Zone appears stratigraphically related to recently discovered oxidized copper mineralization at the Lourdes Zone that was drilled in 2022 with similar copper grades and intercepts (see news release dated July 6, 2022). A video showing the oxidized copper exposure at the surface of Diana can be seen here. The Diana Zone is located approximately 1.5 km northeast of Lourdes and 2.2 km northwest of Camino's main copper discovery zone at Adriana.Highlights:1.05% total copper and 14 ppm silver over 56 metres in channel sample along azimuth 130°, samples name: \"X061522 to X061550\" (#29 samples) at Diana Zone with no prior drilling.An EIA drilling permit expansion expected in Q2 2023 to open 6,012 hectares for drilling.\"We are stepping out by several kilometers to identify satellite copper oxide deposits starting at the high-grade oxidized copper outcrop at Diana. Diana has surface channel samples of 1.05% Copper (Cu) and 14 ppm Ag over 56 metres with similar high-grade copper to our successful drilling campaign in 2022 where we intercepted 55.5 metres of 0.93% Cu and 6.71 ppm Ag (DCH-097) from surface at the Lourdes discovery\", said Jay Chmelauskas, CEO of Camino Corp. \"Our EIA drilling permit expansion is expected in Q2, which will expand our current EIA to 6,012 hectares, allowing us to target a larger and broader copper system over several kilometers, including three mineralized fault systems along the Diva, Atajo, and now Lagunillas faults. Our geological model targets buried porous geology that has the potential to host additional copper mantos previously found in weathered oxidized copper outcrops like Diana.\"Head of Peru exploration, Felix Cornelio said, \"Diana is located on the regional Lagunillas fault structure that runs para...