Business

Cambria Gold Mines Reports Results From 2024 & 2025 Drilling, Including 20.7 g/t Au and 50.1 g/t Ag over 15.9 meters at Big Missouri Extension

Vancouver, British Columbia--(Newsfile Corp. - March 3, 2026) - Cambria Gold Mines Inc. (TS...

articleCambria Gold Mines Inc.March 3, 20265/company/cambria-gold-mines-inc/news/cambria-gold-mines-reports-results-from-2024-and-2025-drilling-including-207-gt-au-and-501-gt-ag-over-159-meters-at-big-missouri-extension
Cambria Gold Mines Reports Results From 2024 & 2025 Drilling, Including 20.7 g/t Au and 50.1 g/t Ag over 15.9 meters at Big Missouri Extension

About this update from Cambria Gold Mines Inc.

[{"type":"text","content":"Cambria Gold Mines Reports Results From 2024 & 2025 Drilling, Including 20.7 g/t Au and 50.1 g/t Ag over 15.9 meters at Big Missouri ExtensionVancouver, British Columbia--(Newsfile Corp. - March 3, 2026) - Cambria Gold Mines Inc. (TSXV: CAMB) (OTC: AOTVF) (\"Cambria\" or the \"Company\") is pleased to announce the results from the 2024 and 2025 drilling programs at the Premier Gold Project (\"PGP\" or \"Premier Project\"), located in northwestern British Columbia. Highlights include: High grade gold over significant widths in Big Missouri extension drilling, including 15.9m @ 20.75g/t Au & 51.0g/t Ag in hole P25-2695a and 6.9m @ 32.81g/t Au & 13.4g/t Ag in hole P25-2670. A newly defined target with high-grade gold intercepted proximal to the existing Premier mill facility and outside the current resource area, near the historic Sebakwe mine. Results include: 3.9m @ 16.20 g/t Au & 68.0 g/t Ag in hole P25-2673 and 1.3m @ 32.40 g/t Au & 9.1g/t Ag in hole P25-2683.A total of 26,303 metres of surface drilling was completed in 2024 and 2025 from 135 exploration diamond drillholes. The drill programs focused on infill and extension drilling for the Big Missouri deposit and on new target areas surrounding the Premier-Northern Lights (PNL) deposit. All 2025 drill samples were both prepared and analyzed by ALS Canada Ltd (\"ALS\"). Reported results from 2024 drilling are from reanalysis by ALS of pulps originally prepared and analyzed at a contracted grade control laboratory in Stewart, BC when the Premier Project was in active operation. \"The identification of high-grade gold mineralization proximal to the Big Missouri and PNL deposits demonstrates the strong resource expansion potential at the Premier Gold Project; these results will help inform remodelling work as we redefine Big Missouri's geological potential and the high-grade gold results 600 meters north of the PNL deposit are highly encouraging,\" said Robert McLeod, President and CEO of Cambria Gold Mines. \"Our 2026 drilling program has recently commenced and will target upgrading and expansion of current Mineral Resources.\" 2025 Exploration Drilling - Big Missouri ExtensionA total of 3,252 metres over 15 holes were drilled in 2025 to test the southwestern extension of the Big Missouri deposit, yielding multiple high-grade gold intercepts. The highes...

More updates from Cambria Gold Mines Inc.