Business
Cadeler Acquires Additional Jack-Up Vessel in Strategic Expansion to Meet Growing Global O&M Demand
COPENHAGEN, Denmark, May 22, 2025--Cadeler today announces that it has agreed to acquire the Boqiang 3060 – a newly-constructed jack-up wind turbine installation vessel (WTIV) – from Shanghai Boqiang Heavy Industry Group Co., Ltd, expanding its fleet and enhancing its capacity to meet the increasing global demand for offshore wind turbine operations & maintenance (O&M) services.
About this update from Cadeler A/s
[{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":1024,"height":512,"url":"https://media.zenfs.com/en/business-wire.com/51047e1dd0c0a9a1b17d9cf7ccd4dd9e"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/ui_RFP6W78zQMK6EreSUUA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTQ4MDtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/51047e1dd0c0a9a1b17d9cf7ccd4dd9e","width":960,"height":480},"lightbox":{"url":"https://s.yimg.com/ny/api/res/1.2/ZF61FwTVNnvGdn3A1uLhbA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTIwNDg7aD0xMDI0O2NmPXdlYnA-/https://media.zenfs.com/en/business-wire.com/51047e1dd0c0a9a1b17d9cf7ccd4dd9e","width":1024,"height":512}},"lazy":false},{"type":"text","content":"COPENHAGEN, Denmark, May 22, 2025--(BUSINESS WIRE)--Cadeler today announces that it has agreed to acquire the Boqiang 3060 – a newly-constructed jack-up wind turbine installation vessel (WTIV) – from Shanghai Boqiang Heavy Industry Group Co., Ltd, expanding its fleet and enhancing its capacity to meet the increasing global demand for offshore wind turbine operations & maintenance (O&M) services.","length":406,"tagName":"p"},{"type":"text","content":"The vessel will be renamed Wind Keeper, a name symbolising both the vessel’s position as a rare and valuable find – a true "keeper" – and her focus on ensuring the up-keep of green energy generation through the provision of O&M services to the offshore wind industry.","length":281,"tagName":"p"},{"type":"text","content":"Completed in 2024 and fitted with advanced European equipment, including a Huisman main crane with a 2,200 t lifting capacity, Kongsberg’s DP2 dynamic positioning system, MAN-supplied engines and a Siemens propulsion system, the vessel is uniquely suited for the global offshore O&M market, with 120-meter-long jack-up legs that will enable her to work on the most challenging offshore sites.","length":396,"tagName":"p"},{"type":"text","content":"Cadeler expects to take delivery of the Wind Keeper in Q3 2025, for a purchase price significantly below the vessel’s estimated replacement cost. While the vessel comes equipped to a high standard, Cadeler will invest in certain upgrades to improve her operational capacity and align her onboard offering with that of Cadeler’s existing fleet. After the contemplated upgrades...