Business
C3 Metals Intersects 286 Metres at 0.37% Copper and 0.21 g/t Gold, Including 192 Metres at 0.45% Copper and 0.27 g/t Gold, at Bellas Gate, Jamaica
Toronto, Ontario--(Newsfile Corp. - September 12, 2023) - C3 Metals Inc. (TSXV: CCCM) (OTCQB: C...

About this update from C3 Metals Inc.
[{"type":"text","content":"C3 Metals Intersects 286 Metres at 0.37% Copper and 0.21 g/t Gold, Including 192 Metres at 0.45% Copper and 0.27 g/t Gold, at Bellas Gate, JamaicaToronto, Ontario--(Newsfile Corp. - September 12, 2023) - C3 Metals Inc. (TSXV: CCCM) (OTCQB: CUAUF) (\"C3 Metals\" or the \"Company\") is pleased to announce the intersection of strong porphyry copper-gold mineralization in the first two holes of its recently commenced drill program on the Company's 100% owned Bellas Gate project in Jamaica. Complete assays have been received for hole PVT0900-001 (EOH 152.0m) and partial assays for PVT0900-002 down to 350.0m depth (EOH 480.7m). PVT0900-001 was the maiden drill hole with the Company's recently purchased, man-portable drill rig and was a training hole for the new Jamaican drilling team and trainers. Both holes confirmed broad zones of near surface copper-gold mineralization (see Table 1).To date, approximately 1,650m of a fully funded and recently announced 8,500m drill program have been completed. Ongoing drilling will continue evaluating a cluster of discrete high priority porphyry copper-gold targets. These targets are defined by geology, soil geochemistry and geophysics along the two parallel Camel and Connors porphyry belts at the Bellas Gate project (Figure 1). Drilling HighlightsLongest interval of copper-gold mineralization intersected at Provost to date.285.9m at 0.37% copper and 0.21 g/t gold (0.52% CuEq1) from 64.1m, including 191.5m at 0.45% copper and 0.27% gold (0.64% CuEq1) intersected in the upper 350m of hole PVT0900-002.Copper sulphide mineralization logged to the end of hole PVT0900-002 at 480.7m (Figure 3). Assays are pending for the lower 130.7m with the last assay interval returning 12.0m (338.0m to 350.0m) at 0.46% copper and 0.27 g/t gold (0.64% CuEq1). 92.0m at 0.24% copper and 0.12 g/t gold (0.32% CuEq1) from 60.0m intersected in hole PVT0900-001. End of Hole assayed 0.23% copper and 0.10 g/t gold (0.30% CuEq1) over its last 2.0m interval.Multiple phases of alteration, veining, and mineralization evident, porphyry copper-gold mineralization overprinted by intermediate and high-sulphidation epithermal veining. C3 Metals' recently purchased man portable drill rig is performing strongly with excellent penetration rates being achieved at very low direct drilling costs to date. Three holes for approximately 1,100m n...