Business
C3 Metals Intersects 269m at 0.30% Copper, Including 60.4m at 0.41% Copper from 346m in First Ever Drill Hole at Khaleesi Copper Project, Peru
Toronto, Ontario--(Newsfile Corp. - December 15, 2025) - C3 Metals Inc. (TSXV: CCCM) (OTCQB: CU...

About this update from C3 Metals Inc.
[{"type":"text","content":"C3 Metals Intersects 269m at 0.30% Copper, Including 60.4m at 0.41% Copper from 346m in First Ever Drill Hole at Khaleesi Copper Project, PeruToronto, Ontario--(Newsfile Corp. - December 15, 2025) - C3 Metals Inc. (TSXV: CCCM) (OTCQB: CUAUF) (\"C3 Metals\" or the \"Company\") is pleased to announce that the first hole ever drilled at its 100%-owned Khaleesi copper project (\"Khaleesi\" or \"the Project\") in southern Peru intersected 269.0m at 0.30% copper, including 60.4m at 0.41% copper from 346.0m downhole (approximately 250.0m vertical depth). Khaleesi is a highly compelling greenfield copper project that the Company is currently testing for the first time using two diamond drill rigs and a minimum of 6,000m of drilling (see press release dated September 30, 2025). Initial results demonstrate the potential for a large, well-mineralized magnetite and garnet skarn body interfingered with multiple intrusive bodies. The mineralized skarn-intrusive contact zone appears well defined by coincident strong chargeability and magnetic anomalies. Importantly, drilling confirms that copper mineralization continues under an extensive area of shallow glacial till cover.Dan Symons, President and CEO, stated, \"To intersect a broad zone of copper mineralization in the first ever hole drilled on a greenfield project like Khaleesi is a tremendous result. The porphyry and skarn systems along the Andahuaylas-Yauri belt can typically host very large tonnages. Based on size and strength of the alteration, mineralization, geophysical footprints, and the geology we are seeing in drilling, Khaleesi clearly demonstrates the potential for a large copper system analogous to some of the large nearby deposits. Additionally, copper grades in this first hole are consistent with mine grades in the district1. Importantly, we have now confirmed that copper mineralization extends under an extensive area of thin glacial till cover, which significantly increases the drill target area of the Khaleesi system. More drilling will be required before we can determine the ultimate size of the Khaleesi system, but with the results of this first ever hole, we are off to a great start.\"Khaleesi First Ever Drill Hole HighlightsDrill hole KHZ5800-001 was drilled to a depth of 626.1m and ended in copper mineralization.A broad zone of near-surface, skarn- and porphyry-style c...