Business

BW Offshore: First quarter results 2026

First quarter results 2026 HIGHLIGHTS Q1 EBITDA of USD 47.9 million and operating cash flow of USD 43.3 millionRobust balance sheet with USD 568 million in available liquidityQ1 cash dividend of USD 0.063 per shareBW Opal production restarted, commissioning and practical completion expected mid-2026Signed FEED with Equinor for Bay du Nord FPSO and established local office in St. John’sExtended BW Catcher contract through 2030Strategic review progressingFull-year 2026 EBITDA guidance revised to U

articleBw Offshore LimitedMay 18, 20267/company/bw-offshore-limited/news/bw-offshore-first-quarter-results-2026
BW Offshore: First quarter results 2026

About this update from Bw Offshore Limited

[{"type":"image","alt":"BW Offshore","displaySize":"","headline":null,"caption":"BW Offshore","className":"","disableSlideshowImg":false,"size":{"original":{"width":71,"height":82,"url":"https://media.zenfs.com/en/globenewswire.com/96eed08055682c8265d935254b9d4d77"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/EhsuQvEWyYDymJILbaK5LA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTExMDtoPTEyNw--/https://media.zenfs.com/en/globenewswire.com/96eed08055682c8265d935254b9d4d77","width":71,"height":82},"resize_sm":{"url":"https://s.yimg.com/ny/api/res/1.2/EhsuQvEWyYDymJILbaK5LA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTExMDtoPTEyNw--/https://media.zenfs.com/en/globenewswire.com/96eed08055682c8265d935254b9d4d77","width":71,"height":82}},"lazy":false},{"type":"text","content":"First quarter results 2026","length":26,"tagName":"p"},{"type":"text","content":"HIGHLIGHTS","length":10,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Q1 EBITDA of USD 47.9 million and operating cash flow of USD 43.3 million","length":73,"tagName":"p"}]},{"val":[{"type":"text","content":"Robust balance sheet with USD 568 million in available liquidity","length":64,"tagName":"p"}]},{"val":[{"type":"text","content":"Q1 cash dividend of USD 0.063 per share","length":39,"tagName":"p"}]},{"val":[{"type":"text","content":"BW Opal production restarted, commissioning and practical completion expected mid-2026","length":86,"tagName":"p"}]},{"val":[{"type":"text","content":"Signed FEED with Equinor for Bay du Nord FPSO and established local office in St. John’s","length":88,"tagName":"p"}]},{"val":[{"type":"text","content":"Extended BW Catcher contract through 2030","length":41,"tagName":"p"}]},{"val":[{"type":"text","content":"Strategic review progressing","length":28,"tagName":"p"}]},{"val":[{"type":"text","content":"Full-year 2026 EBITDA guidance revised to USD 310-340 million","length":61,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":480,"olType":false},{"type":"text","content":"On BW Opal, the replacement of the compressor dry-gas seals was completed in March. Gas production recommenced in early May after a temporary shutdown during March and April for cleaning the heat exchanger trains. A root cause analysis of the heat exchanger fouling has been completed and is currently under joint review by Santos and BW Offshore. Commissioning is progressing in parallel with practical comple...

More updates from Bw Offshore Limited

operating cash flowBW OffshoreThe CompanyBW OpalCatcherEquinor for Bay du Nord FPSOproject execution plan