Business

BW Energy: Makes FID on Maromba field development in Brazil

BW Energy makes FID on Maromba field development in Brazil BW Energy is pleased to announce the final investment decision (FID) for the Maromba development offshore Brazil based on a capex-efficient development with an integrated drilling and wellhead platform (WHP) and a refurbished FPSO. The development targets 500 million barrels of oil in place in the highly delineated and tested Maastrichtian sands. First oil is planned by end-2027 with expected plateau production of 60,000 barrels of oil p

articleBw Energy Ltd.May 5, 20256/company/bw-energy-ltd-1/news/bw-energy-makes-fid-on-maromba-field-development-in-brazil-1
BW Energy: Makes FID on Maromba field development in Brazil

About this update from Bw Energy Ltd.

[{"type":"image","alt":"BW Energy Services Limited","displaySize":"","headline":null,"caption":"BW Energy Services Limited","className":"","disableSlideshowImg":false,"size":{"original":{"width":71,"height":82,"url":"https://media.zenfs.com/en/globenewswire.com/8710064c0508eb96954180f9b98e86bc"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/zA7J552wlEqXlAH_4kLK0Q--/YXBwaWQ9aGlnaGxhbmRlcjt3PTExMDtoPTEyNztjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/8710064c0508eb96954180f9b98e86bc","width":71,"height":82}},"lazy":false},{"type":"text","content":"BW Energy makes FID on Maromba field development in Brazil ","length":58,"tagName":"p"},{"type":"text","content":"BW Energy is pleased to announce the final investment decision (FID) for the Maromba development offshore Brazil based on a capex-efficient development with an integrated drilling and wellhead platform (WHP) and a refurbished FPSO. The development targets 500 million barrels of oil in place in the highly delineated and tested Maastrichtian sands. First oil is planned by end-2027 with expected plateau production of 60,000 barrels of oil per day. The development will more than double BW Energy’s total net production by 2028 and has short pay-back time.","length":561,"tagName":"p"},{"type":"text","content":"Project highlights:","length":24,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Initial six production wells from the WHP","length":41,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":41,"olType":false},{"type":"list","items":[{"val":[{"type":"text","content":"The WHP will be a converted drilling jack-up with up to 16 well slots and production- and test-flowlines connected to the redeployed FPSO BW Maromba (ex. Polvo)","length":165,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":165,"olType":false},{"type":"list","items":[{"val":[{"type":"text","content":"A second six-well drilling campaign will fully leverage the established field infrastructure and allow for appraisal and testing of other reservoir horizons","length":156,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":156,"olType":false},{"type":"list","items":[{"val":[{"type":"text","content":"BW Maromba refurbishment and life extension work is already underway at the COSCO yard in China","length":95,"tagName":"p"}]}],"tagName":"ul","bulletedList":t...

More updates from Bw Energy Ltd.

MarombaFPSOdevelopmentinitial developmentbarrels of oildrilling campaignWHPdevelopment conceptEnergy