Business
Brixton Metals Provides Initial Assay Results from its Maiden Drill Program at the Cirque Cu-Mo Porphyry Target
VANCOUVER, British Columbia, Sept. 17, 2024 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to

About this update from Brixton Metals Corporation
[{"type":"text","content":" VANCOUVER, British Columbia, Sept. 17, 2024 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce its third drill hole results of the 2024 season from its wholly owned Thorn Project located in NW British Columbia, Canada. The Thorn Project is an underexplored copper-gold porphyry district with 16 large scale exploration target areas identified. Brixton is operating with two diamond drills and will continue drilling until the end of the season. Highlights Brixton Metals’ maiden drill program at the Cirque Target has intercepted broad zones of Cu-Mo porphyry style mineralization starting from surface, including: Hole THN24-292 returned: 87.00m of 0.26% CuEq including 28.50m of 0.29% CuEq Hole THN24-293 returned: 37.50m of 0.28% CuEq within 425.50m of 0.16% CuEq Drilling has targeted a potassic alteration zone with chalcopyrite and molybdenite mineralization at surface, located within a larger 3.6 km x 1.6 km area of phyllic to potassic alteration. The Cirque Porphyry Target is located approximately 3 km NE of the Camp Creek Porphyry Target, on trend along the Camp Creek fault. Geological mapping in 2024 has identified additional areas of porphyry style alteration along this trend. Vice President of Exploration, Christina Anstey, stated, “The initial drill holes at Cirque have significantly enhanced our understanding of this early-stage drill target. The presence of porphyry style mineralization and alteration is highly encouraging and gives us a strong foundation to build on as we continue to explore and advance this target.” Project Geologist Leanne Hawkins Highlights the Cirque Target, Thorn Project: https://www.youtube.com/watch?v=fnXFv7BYMeI Figure 1. Thorn Project Location Map with Copper Geochemistry. Table 1. Select Assay Intervals for Initial Drilling at the Cirque Porphyry Target. Hole ID From (m) To (m) Interval (m) Cu (%) Au (g/t) Ag (g/t) Mo (ppm) CuEq (%) THN24-292 14.75 401.00 386.25 0.10 0.04 1.81 47 0.16 including 126.00 213.00 87.00 0.20 0.04 2.61 34 0.26 including 135.00 163.50 28.50 0.23 0.03 3.22 30 0.29 including 135.00 145.50 10.50 0.37 0.04 5.22 36 0.44 THN24-293 8.40 433.90 425.50 0.11 0.02 1.76 42 0.16 including 144.00 335.50 191.50 0.14 0.02 1.91 51 0.19 including 145.50 223.50 78.00 0.19 0.02 2.37 34...