Business
Brixton Metals Provides Exploration Plans for Gold and Copper Drill Targets for its Fully Funded 2025 Program at its Thorn Project
VANCOUVER, British Columbia, May 06, 2025 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSX-V...

About this update from Brixton Metals Corporation
[{"type":"text","content":"Brixton Metals Provides Exploration Plans for Gold and Copper Drill Targets for its Fully Funded 2025 Program at its Thorn Project\n\n\n\n VANCOUVER, British Columbia, May 06, 2025 (GLOBE NEWSWIRE) -- Brixton Metals Corporation\n \n (TSX-V: BBB, OTCQB: BBBXF)\n \n (the “\n \n Company\n \n ” or “\n \n Brixton\n \n ”) is pleased to announce its 2025 exploration plans for its wholly owned Thorn Copper-Gold Project. The 2945 square kilometer project is located in Northwest British Columbia, Canada, approximately 90km northeast from Juneau, AK.\n \n\n\n Highlights of Exploration Plan for 2025:\n \n\n\n\n The 2025 season has a two-pronged approach: i) expand near surface gold mineralization and ii) drill for new, near surface copper porphyry discoveries for a combined 8000m to 10,000m.\n \n\n\n\n Shallow drilling to establish the continuity and strike of new feeder-structure high-sulphidation style gold-copper-silver mineralization encountered in holes 307/294/221 within the\n \n Camp Creek Corridor.\n \n Hole 307 returned 8.00m of 4.52 g/t gold, 148.6 g/t silver, 0.54% copper. Shallow drilling to test the up-dip gold zone identified in hole 221 that returned 55.8 g/t gold over 1.5m from 449.5m depth.\n \n\n\n\n Drill for new gold mineralization at the\n \n Trapper Gold\n \n\n Target\n \n . Expansion drilling in 2024 returned 2m of 44.43 g/t gold within 8m of 11.37 g/t gold. Follow up drilling is planned along In-law Creek where rock grab samples of in-situ gold have returned up to 152 g/t gold. In addition, drill test within a 2km on-trend gap between the main zone (64m of 5.74 g/t gold) at Trapper and the drilling in 2011 where hole TG11-11 returned 22.86m of 2.51 g/t gold including 4.26m of 9.18 g/t gold.\n \n\n\n\n Drill test two\n \n new\n \n\n copper porphyry\n \n targets\n \n Catalyst\n \n and\n \n Tempest.\n \n These new targets are located 6-8 km northeast from the Camp Creek porphyry discovery along the Camp Creek Corridor. Rock grab samples of porphyry style stockwork veins from\n \n Catalyst\n \n returned up to 0.56% copper, 2.87 g/t gold and 30 g/t silver. The showing is located within a broader 1.6km by 1km northeast trending phyllic to argillic alteration zone and remains open.\n \n\n\n\n\n CLICK HERE\n \n for a 3D presentation of the Thorn Project.\n \n\n\n\n Chairman and CEO, Gary R. Thomps...