Business

Brixton Metals Drills 375 oz/t (11,663 g/t) Silver, 0.7% Cobalt over 1.2m at its Langis Project, Ontario

VANCOUVER, British Columbia, Feb. 01, 2021 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSXV: BBB) (the “Company” or “Brixton”) is pleased to announce furthe

articleBrixton Metals CorporationFebruary 1, 20214/company/brixton-metals-corporation/news/brixton-metals-drills-375-ozt-11663-gt-silver-07percent-cobalt-over-12m-at-its-langis-project-ontario
Brixton Metals Drills 375 oz/t (11,663 g/t) Silver, 0.7% Cobalt over 1.2m at its Langis Project, Ontario

About this update from Brixton Metals Corporation

[{"type":"text","content":" VANCOUVER, British Columbia, Feb. 01, 2021 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSXV: BBB) (the “Company” or “Brixton”) is pleased to announce further high-grade drill results from its fall/winter exploration program at its wholly owned Langis Project located in the Cobalt Camp of Ontario, Canada. The fall/winter program consists of 20,000m of drilling, of which 11,533.65m has been completed. Assay results for 4,881.05m has been released previously. This press release includes assays from 14 holes totaling 1,583.2m of NQ size core from shallow drilling. Highlights LM-20-133 cut 2m of 5,847 g/t Ag from 16.6m, including 1.2m of 11,663 g/t (375 oz/t) Ag, 0.71% Co and 9m of 272 g/t Ag from 23.6m including 1m of 1,500 g/t Ag, 0.26% Co LM-20-131 cut 7m of 962 g/t Ag including 1m of 3,050 g/t Ag, 0.17% Co LM-20-122 cut 1.9m of 1,596 g/t Ag, including 0.9m of 3,180 g/t Ag LM-20-128 cut 3m of 422 g/t Ag, including 1m of 1,115 g/t Ag, 0.16% Co Chairman and CEO of Brixton, Gary R. Thompson stated, “Brixton’s Langis Project continues to deliver, near-surface, high-grade silver and cobalt results over intervals of considerable width, demonstrating this project’s potential. Drilling will be ongoing over the next few months to complete the planned 20,000m drill program as we continue to advance the Langis Project toward a maiden resource.” Figure 1. Location Maps of the Shaft 3 Drilling Area Langis Project, February 1, 2021 Table 1. Langis Winter Drilling Highlights Near Shaft 3. Hole ID From (m) To (m) Interval (m) Ag (g/t) Co (%) Ag (g/t * m) LM-20-122 117.60 119.50 1.90 1,596.60 0.03 3,033.54 including 118.60 119.50 0.90 3,180.00 0.05 2,862.00 LM-20-123 94.80 101.60 6.80 20.41   138.82 LM-20-123 104.60 112.80 8.20 25.16   206.33 LM-20-128 8.00 11.00 3.00 422.33 0.05 1,267.00 including 9.00 10.00 1.00 1,115.00 0.16 1,115.00 LM-20-129 8.60 11.60 3.00 280.97   842.90 LM-20-130 9.60 11.60 2.00 275.00 0.04 550.00 LM-20-131 8.90 15.90 7.00 962.31 0.03 6,736.20 including 10.90 11.90 1.00 2,190.00   2,190.00 including 12.90 13.90 1.00 3,050.00 0.17 3,050.00 LM-20-131 29.90 32.90 3.00 94.70   284.10 LM-20-132 17.00 19.00 2.00 62.25   124.50 LM-20-132 26.00 36.00 10.00 70.86 0.02 708.60 including 30.00 31.00 1.00 272.00 0.03 272.00 including 34.00 35.00 1.00 143.00   143.00 LM-20-133 16.60 18.60 2.00 5,8...

More updates from Brixton Metals Corporation