Business
Brixton Metals Drills 24m of 187 g/t Silver, including 10m of 356 g/t Ag, including 2m of 1077 Ag at its Langis Project, Ontario
VANCOUVER, British Columbia, May 06, 2021 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSXV: BBB) (OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to a

About this update from Brixton Metals Corporation
[{"type":"text","content":" VANCOUVER, British Columbia, May 06, 2021 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSXV: BBB) (OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce further high-grade silver results from its exploration program at its wholly owned Langis Project located in the Cobalt Camp of Ontario, Canada. The fall/winter 2020-2021 program consisted of a total of 18,453.35m of NQ core over 163 holes. This news release includes the last 14 unreleased holes, LM-21-240 to LM-21-253, which were focused in the Shaft 6 area. Highlights LM-21-242 drilled 3m of 1341 g/t Silver, 0.06% Cobalt from 128m depth including 1m of 2060 g/t Silver, 0.06% Cobalt LM-21-245 drilled 24m of 187 g/t Silver, 0.02% Cobalt from 131m depth including 10m of 356 g/t Silver, 0.02% Cobalt including 2m of 1077 g/t Silver, 0.04% Cobalt A large nickel anomaly is emerging based on all drilling at the Langis Project LM-21-233 drilled 68m of 14.3 g/t Ag, 0.12% Ni, 0.01% Co, 0.1% Zn including 6m of 78 g/t Ag, 0.23% Ni, 0.02% Co, 1% Zn Chairman and CEO of Brixton, Gary R. Thompson stated, “The recent fall/winter program was very successful in identifying new silver bonanza zones near the old workings and was highlighted by broad zones of silver-cobalt mineralization. We are in the process of modelling these results to further define next steps for the project with a primary goal of moving a number of targets into a maiden resource category. The nickel mineralization appears to be wide open and we believe it warrants further exploration.” Figure 1. Location Maps of the Recent Drilling, Langis Project: Table 1. Drilling Highlights from Holes LM-21-240 to LM-21-253. Hole ID From (m) To (m) Interval (m) Ag (g/t) Co (%) Ag (g/t * m) LM-21-241 114.80 116.80 2.00 171.45 0.25 342.90 LM-21-241 127.80 135.80 8.00 88.35 0.09 706.80 including 130.80 131.80 1.00 405.00 0.39 405.00 LM-21-242 128.00 131.00 3.00 1,341.00 0.06 4023.00 including 130.00 131.00 1.00 2,060.00 0.06 2060.00 LM-21-244 115.60 119.60 4.00 81.85 0.01 327.40 LM-21-244 161.60 162.60 1.00 340.00 - 340.00 LM-21-244 222.60 223.60 1.00 344.00 0.05 344.00 LM-21-245 131.40 155.40 24.00 186.85 0.02 4484.50 including 134.40 135.40 1.00 204.00 0.23 204.00 including 141.40...